Similar Projects
Dartmouth College Hopkins Center for the Arts
Renovation, Addition
Design
$70,000,000 est. value
Hanover, NH 03755

Littleton Campus Renovation
Renovation
Design
$450,000 est. value
Littleton, NH 03561

Construction Manager - Keene State College Redfern Hall Renovation
Renovation
Bidding
$175,000 est. value
Keene, NH 03431

Draper and Maynard Column Repair
Results
Plymouth, NH 03264

UNH - CM Services - Barton Hall 2nd Floor Lab Renovation
Renovation
Results
Durham, NH 03824

Dartmouth College Thayer Center for Engineering & Computer Science
New Construction - 180,000 SF
Construction
$200,000,000 est. value
Hanover, NH 03755

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Construction Management Services for Projects Statewide NH
New Construction
Results

UNH - Morse Hall Former Clean Room Renovation
Renovation
Results
Durham, NH 03824

CM Services - PSU Strength and Conditioning Center Renovation
Renovation - 17,000 SF
Results
Plymouth, NH 03264

PSU Draper and Maynard 4th Floor Renovations for EMTR Classroom
Renovation
Results
Plymouth, NH 03264

CM Services - UNH Huddleston Hall Renovations
Renovation
Results
Durham, NH 03824

Reported 05/07/2022 12:00 AM
Project Title

Emergency Response and Restoration Services - Facility Operations and Maintenance

Physical Address View project details and contacts
City, State (County) State-Wide: NH
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The University System of New Hampshire (hereafter referred to as USNH or Owner) representing Granite State College, Keene State College, Plymouth State University and University of New Hampshire is requesting proposals for emergency and restoration services resulting from fire, flood, storm damage, utility failures and vandalism under a term agreement. It is the Owner’s intent to award to multiple contractors and to give preferred status based on contractors that offer the most competitive labor rates, materials markup, quality services and timely response.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents