Similar Projects
Wausau - Merrill Constr / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Wausau, WI 54401

Camp Phillips Road Town Homes
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Weston, WI 54476

V Marathon City, Main Street Const / Resurface
Infrastructure
Design
$500,000 CJ est. value
Marathon, WI 54448

RFP - Purchase and Develop Village Owned Property at 5500 Schofield Avenue
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Weston, WI 54476

T Rib Falls, Jersey Falls Trail, Pine Creek Bridge
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Marathon, WI 54448

Veteran's Park Advanced Grading
Infrastructure
Post-Bid
$230,000 est. value
Marathon City, WI 54448

Culvert
Infrastructure
Post-Bid
Weston, WI

Stratford - Goodrich, South County Line to STH 64
Infrastructure
Results
Goodrich, Stratford, WI

Rudolph - Knowlton, STH 34 and CTH DB / Old 51 Intersection
Infrastructure
Results
$2,000,000 to $2,999,999 est. value
Mosinee, WI 54455

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Old Highway 51 Reconstruction STH 34 - Bird Lane
Infrastructure
Construction
$2,029,144 CJ est. value
Knowlton, WI 54455

South 1st Avenue Apartments
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Wausau, WI 54401

The Foundry on 3rd
New Construction, Infrastructure - 141,515 SF
Pending Verification
$44,000,000 CJ est. value
Wausau, WI 54403

Village of Spencer, STH 98 East Xing Repair 689933j Mile Post 289.8
Infrastructure
Design
$250,000 CJ est. value
Spencer, WI 54479

Schofield City Hall Alterations and Addition
Addition, Demolition, Renovation, Infrastructure - 30,322 SF
Bidding
$500,000 CJ est. value
Schofield, WI 54476

Last Updated 03/07/2023 08:09 AM
Project Title

Construction Contractor for Cured-In-Place Culvert Liners

Physical Address View project details and contacts
City, State (County) Kronenwetter, WI 54455   (Marathon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $19,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall consist of preparing existing culvert for installation of curedin-place culvert liner, bypass pumping or flow division, installation of liner and all cleanup. Traffic control will be setup and maintained as needed by the Portage County Highway Department. A minimum 3 working days notice shall be given to set up traffic control. All material and work performed shall be in accordance with the Wisconsin Department of Transportation Standard Specifications 2023 and the Project Special Provisions. Bidding and construction will be based on the enclosed Bid forms. The Portage County Highway Department will clear an area of 5x 5 at each end of the culvert(s) to allow room for construction of the culvert liners. A minimum notice of 5 working days notice shall be given to allow the completion of this work. All questions about the meaning or intent of the Bidding Documents are to be submitted to OWNER by 2 PM on Tuesday, February 21, 2023. The Portage County Highway Department (OWNER) is accepting sealed bids for a cured-in-place culvert liner project, on CTH X, Town of Dewey. The contract completion time is 3 working days with activities complete by September 15, 2023. If Alternates #1 and/or #2 are selected, one (1) additional working day per alternate will be added to the contract. Items of work include preparing, furnishing and installing cured-in-place-pipe liners. All material and work performed shall be in accordance with the Wisconsin Department of Transportation Standard Specifications and the Projects Special Provisions. Bids must be submitted in a sealed envelope marked CTH X, Town Of Dewey, Cured-In-Place Culvert Liner Project . The OWNER reserve the right to reject any and all bids, waive any informalities in bidding or to accept the bid or bids that best serves the interests of the OWNER. Portage County Board of Supervisors meeting, depending on the OWNERs needs, budgets, and schedules. For bidding questions or additional information, contact Chris Schultz, Purchasing Director at (715) 346-1393, schultzc@co.portage.wi.us.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents