Similar Projects
Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2021 Street and Utility Improvements
Results
Milton, WI 53563

Euclid Avenue Reconstruction; Phase 1 and 2
Infrastructure
Results
Beloit, WI 53511

Liberty, Shirland and Willowbrook Concrete Panel Replacement
Alteration
Post-Bid
$400,000 est. value
Beloit, WI

2021 Miscellaneous Concrete Repairs
Alteration
Results
$20,000 est. value
Milton, WI

2022 Water Service Replacements
Infrastructure
Post-Bid
Milton, WI

2021 Water Service Replacements
Infrastructure
Results
$60,000 est. value
Milton, WI

Sherwood Drive Utility Extension
Infrastructure
Results
Beloit, WI

Utility Structure Rehabilitation and Replacement
Infrastructure
Results
$1,350,000 est. value
Janesville, WI

Water and Sewer System Improvements I
Infrastructure
Results
Janesville, WI

Public Side Lead Water Service Replacements I
Infrastructure
Results
Janesville, WI

Public Side Lead Water Service Replacements II
Infrastructure
Results
Janesville, WI

2022 Concrete Repair Services
Alteration
Results
Janesville, WI

Fulton Street Extension Improvements
Infrastructure
Results
$255,000 est. value
Janesville, WI 53546

Last Updated 08/05/2022 06:33 AM
Project Title

2022 Sanitary Sewer Televising

Physical Address View project details and contacts
City, State (County) Milton, WI 53563   (Rock County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Concrete, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $8,951 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed bid shall include costs for all labor, equipment, traffic control, safety and mobilization to complete the project. Upon completion the contractor shall provide the City two (2) copies of reports of the televising results, and two (2) USB flash drives of all televising. The contractor shall have equipment capable of televising all sewer sized between six (6) and eighteen (18) inch diameter. The total footage may be adjusted based on bids and budget.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents