Similar Projects
Beverly Hills Middle School Toilet Room Modernization Phase 2 - General Construction
Renovation
Bidding
Upper Darby, PA 19082

Haverford High School Project 2 - General Construction
New Construction, Renovation, Addition - 19,850 SF
Sub-Bidding
$8,842,000 est. value
Havertown, PA 19083

Springfield High School Phase 2 - Bid Package 3
New Construction - 10,000 SF
Post-Bid
Springfield, PA 19064

Athletic Field Renovations at Marple Newtown High School
Post-Bid
Newtown Square, PA 19073

Garnet Valley Middle and Elementary Schools Secure Entry Renovations
Renovation
Results
Glen Mills, PA 19342

Disaster Recovery Services
Results

Sun Valley High School Addition & Renovations
Renovation, Addition - 19,670 SF
Construction
Aston, PA 19014

Drexel Hill Middle School Toilet Room Modernization
Renovation - 1,830 SF
Construction
$1,800,000 est. value
Drexel Hill, PA 19026

Radnor High School Additions and Renovations Project - General Construction
Renovation, Addition - 23,660 SF
Post-Bid
Wayne, PA 19087

New Vestibule Construction at Drexel Hill Middle School
New Construction
Results
Drexel Hill, PA 19026

New Middle School Construction
New Construction - 213,390 SF
Construction
$86,423,000 est. value
Villanova, PA 19805

Vision Academy Charter School
Renovation - 198,942 SF
Post-Bid
East Lansdowne, PA 19050

Strath Haven High School Secure Entrance Enhancements Project - General Construction
Renovation - 4,000 SF
Results
Wallingford, PA 19086

Additions and Renovations to Haverford High School - General Construction
Renovation, Addition - 30,200 SF
Construction
Less than $8,450,000 est. value
Havertown, PA 19083

Fall 2021/Spring 2022 Halderman Field - General Construction
New Construction
Post-Bid
Springfield, PA

Last Updated 11/23/2021 02:12 PM
Project Title

Clifton Heights Middle School

Physical Address View project details and contacts
City, State (County) Clifton Heights, PA 19018   (Delaware County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Construction Documents, Bidding Expected January 2022
Bids Due View project details and contacts
Estimated Value $65,000,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents