Similar Projects
Replace Sewer Pump Station 10 - Miles Lane - City Of Watsonville
Renovation
Conception
$450,000 CJ est. value
Watsonville, CA 95076

Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Install High Friction Surface Treatment (HFST)
Infrastructure
Design
$6,923,000 CJ est. value
Los Gatos, CA 95033

Santa Cruz Jeep
Demolition, New Construction, Infrastructure - 5,602 SF
Design
$1,500,000 CJ est. value
Santa Cruz, CA 95060

Soquel Dr Main and Hydrant Relocation Project
Infrastructure
Bidding
$144,700 CJ est. value
Soquel, CA 95073

RFP Design - Operations Building at D.A. Porath Facility
Infrastructure
Bidding
$20,000,000 CJ est. value
Santa Cruz, CA 95060

Natural Bridges Apartments
New Construction, Infrastructure - 15,000 SF
Post-Bid
$6,000,000 CJ est. value
Santa Cruz, CA 95060

Seawater Sand Filter Installation
New Construction
Post-Bid
Santa Cruz, CA 95060

Rail Trail Segment 7 Phase 2
Infrastructure
Results
$10,853,016 CJ est. value
Santa Cruz, CA 95060

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

La Madrona Mixed-Use Development
New Construction, Infrastructure - 6,600 SF
Pending Verification
$99,000,000 CJ est. value
Scotts Valley, CA 95060

Garfield Park Playground - c302217 - City of Santa Cruz
Infrastructure
Conception
$300,000 CJ est. value
Santa Cruz, CA 95060

Capitola Hotel
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Capitola, CA 95010

Construct Overcrossing and Auxiliary Lane
Infrastructure
Bidding
$68,000,000 CJ est. value
Capitola, CA 95010

Last Updated 03/30/2023 05:40 PM
Project Title

Well 4 Pump Station

Physical Address View project details and contacts
City, State (County) Watsonville, CA 95076   (Santa Cruz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,050,950 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 22, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Contractor shall perform the work described in the project plans titled "Well 4 Pump Station." The work includes a new well pump station and related site work. The well pump station building includes a pump room, electrical room and chemical room. The pump room will house one vertical turbine pump capable of pumping approximately 1,825 gallons per minute. Bid Bond Percentage: 10% Project Duration: 365 Work Days License Type Required: A & B Pre-Qualification for Bidders: Not Required Engineer's Estimated Cost: $3,500,000 to $4,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. If you have any questions or further requests, please do not hesitate to call. Christopher Ortega Christopher Ortega Calcon Systems Inc. Cell: 925-570-4504 Email: cortega@calcon.com The Engineer's estimate is three million three hundred thousand dollars, ($3,800,000).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents