Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Bidding
$20,000,000 CJ est. value
Boston, MA 02203

Hot Mix Asphalt Recreation Path
Post-Bid
$132,400 est. value
Lincoln, MA

Land Clearing Management
Post-Bid
Hanscom A F B, MA

Highway Sweeping at Various Locations
Results
Less than $285,050 est. value

Pavement Preservation and Related Work at Various Locations
Results
Less than $937,060 est. value

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

Mill and Fill Road Repairs
Post-Bid
$48,320 est. value
Tewksbury, MA

Scheduled and Emergency HMA Pavement and Berm Repairs at Various Locations
Results
Less than $4,330,525 est. value

Trolley Brook Trail from Memorial Drive to Megunko Road
Post-Bid
Ashland, MA

Bridge Cleaning and Related Work at Various Locations
Results
Less than $450,000 est. value

Sidewalk Construction
Post-Bid
Acton, MA

Scheduled and Emergency Pavement Repairs at Various Locations in Area D (Barnstable County)
Results
Less than $470,505 est. value

Cold-in-Place Asphalt Recycling
Term Contract
Post-Bid
$250,000 est. value
Hopkinton, MA

Last Updated 08/10/2022 08:40 AM
Project Title

Street - Harvard Square - Eliot Street - City of Cambridge

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02138   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An FY23 appropriation and bond authorization of $6,000,000 will support the design and construction of surface enhancements on Eliot Street between Brattle Street and Bennett Street. Project improvements will include full depth roadway reconstruction, new sidewalks, new street trees, a separated bike lane, and enhanced transit amenities for the key bus stop on the street. A comprehensive community design process will be undertaken to develop the design of the improvements with an emphasis on designing streets for all users and supporting the City's commitment to Complete Streets, Vision Zero and the Urban Forestry Master Plan. As of August 10, 2022, this project is currently in the FY 2024-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents