Similar Projects
Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Architecture and Engineering Services
Term Contract
Post-Bid
Chicago, IL

143rd Street Traffic Signal Interconnect - Phase III Construction Engineering Services
Post-Bid
Orland Park, IL 60462

GAO Solicitation 05GA0A20Q0004 Architecture Engineering Services
Results
Less than $25,000,000 est. value
Huntsville, AL - Los Angeles, Oakland, CA - Denver, CO - Washington, DC - Atlanta, GA - Chicago, IL - Boston, MA - Dayton, OH - Dallas, TX - Norfolk, VA - Seattle, WA

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

Police Department Firearms Range Renovation
Post-Bid
Less than $400,000 est. value
Lincolnwood, IL 60712

Professional Services for 138KV12.47KV Substation Transformer
Results
Winnetka, IL 60093

Bernard Drive Phase II and III Engineering
Post-Bid
Buffalo Grove, IL

Various Phase III Pavement and Bridge Preservation Inspection
Term Contract
Results
Schaumburg, IL 60168

Police/Fire Department Roof Replacement RFQ
Post-Bid
Less than $500,000 est. value
Lincolnwood, IL 60712

Various Land Survey
Term Contract
Results
Less than $500,000 est. value
Schaumburg, IL 60168

2021 Infrastructure Improvements - Design Services
Post-Bid
Less than $4,300,000 est. value
Lincolnwood, IL 60712

Cermak Road Bridge Phase III Construction Inspection
Results
Schaumburg, IL 60168

Upgrade BAS/HVAC for Bed Tower Procedure Room
Post-Bid
Chicago, IL 60612

Reported 02/09/2022 12:00 AM
Project Title

2022 Water and Sewer Improvements-Phase 3 Engineering Services

Physical Address View project details and contacts
City, State (County) Streamwood, IL   (Cook County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of approximately 5,600 linear feet of new 8-inch water main and appurtenances on Surrey Drive, Surrey Court, Hillside Drive (Oltendorf Road to S Park Boulevard), and Hillside Court. There are 115 homes within the project limits that will need their existing water services connected to the new main. Additionally, the project includes sanitary sewer point repairs on Surrey Drive and Vine Street and a storm sewer repair in a rear yard on Wildwood Court. Storm sewer improvements at the Village’s Public Works Facility are mentioned in the specifications but will not be included in the engineering services.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents