Similar Projects
Drainage Improvement on Various State Maintained Routes
Infrastructure
Bidding
Glendale Heights, Lemont, Mount Prospect, IL

Drainage Improvement on Various State Maintained Routes
Infrastructure
Bidding
$200,000 est. value
Elmhurst, IL

Burlington Highlands Drainage Improvements
Post-Bid
Downers Grove, IL

Retaining Wall
Term Contract
Post-Bid
Darien, IL

Lake Carriage Way Shoreline and Landscape Improvements
Results
Burr Ridge, IL 60527

RR-20-4554 Box Culvert Construction Tri-State Tollway I-294 Ogden Avenue to Cermak Road
Results
Downers Grove, IL

Arbor View Park Playground, Park Amenities, Pavement, and Drainage Improvements Project
Renovation, Infrastructure
Bidding
$386,000 est. value
Lisle, IL 60532

2021 Clow Creek Shoreline Restoration
Post-Bid
Naperville, IL

Willowbrook HS Double Culvert Replacement
Results
Villa Park, IL 60181

Everglade Avenue Drainage Improvements
Post-Bid
Woodridge, IL

Fullerton Park Culvert Lining
Results
Wheaton, IL

Truck Shed Demolition and Drainage Improvements
Infrastructure
Post-Bid
Wheaton, IL

Fox River West Dam And Canoe Chute Repair
Results
Aurora, IL

Various Galvanized Culvert Metal Pipe Materials
Infrastructure
Post-Bid
Darien, IL

Highland Avenue and 41st Street Drainage Improvements
Results
Downers Grove, IL

Reported 04/28/2022 12:00 AM
Project Title

Public Works Construction Contract

Physical Address View project details and contacts
City, State (County) Carol Stream, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $158,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Public Works Construction contract that will restore and stabilize the eroded streambanks of approximately 3,600 linear feet of stream channel. A general description of the work involved is streambank excavation and re-shaping, including re-meandering to create new channel and "oxbow" areas, as well as constructing wetland areas. The stabilization measures to be installed include vegetated rock toe, in-stream rock substrate areas, stream barbs, toe wood with rock, and pre-cast modular retaining walls. The work will also involve clearing and tree removal, fence removal and installation, adjusting storm sewer outfalls, turf restoration, planting native vegetation, and performing maintenance and monitoring during establishment. An in-stream work plan will be required that addresses dewatering operations in order to construct "in the dry", including the discharge from the Village of Carol Stream's Water Reclamation Center.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents