Similar Projects
Library North – Replace Building Switchgear
Alteration
Bidding
$215,000 est. value
Atlanta, GA 30303

Water Treatment Plant Electrical Upgrades
Alteration
Bidding
GA

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Unit 3 and 4 Generator Rewind at Hartwell Powerhouse in Hartwell, GA
Post-Bid
$10,000,000 to $25,000,000 est. value
Hartwell, GA

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Three Phase Pad Mounted Transformers
Results
Covington, GA 30014

Generator Upgrade for Atlanta DDS Facility
Alteration
Bidding
Atlanta, GA 30303

Emergency Generators
Post-Bid
Glennville, GA 30427

Douglass High Replacement of Dimmer Panel
Results
Atlanta, GA 30318

Upgrade LED Lighting Replacement and Upgrade Services of Multiple Buildings
Term Contract, Alteration
Bidding
Cumming, GA 30028

One Portable 250 KW Diesel Powered Generator
Post-Bid
Valdosta, GA 31603

Grady High School - Electrical Power to Modular Units
Results
Atlanta, GA 30309

47500 - Brunswick Generator
Alteration
Bidding
Brunswick, GA 31525

On-Call Electrical Services
Post-Bid
GA

New Kitchen HVAC and Lighting Replace WHS, MRE and WES
Results
Less than $515,824 est. value
Cartersville, White, GA 30120

Reported 07/09/2021 12:00 AM
Project Title

Supply and Complete Installation Standby Generator Sets at Two Sanitary Sewer Lift Stations

Physical Address View project details and contacts
City, State (County) Jefferson, GA   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The design proposal is for the supply and installation of standby generators at the Sumitomo and Preserve sanitary sewer lift stations. Work includes, but is not limited to the following: 1. Sizing of the generators and power transfer switches, etc. to ensure proper operation of each lift station for a period of A MINIMUM of 72-hours; 2. The purchase, delivery and off-loading of each generator and transfer switch; 3. The complete installation of all items including all conduit, wiring, synchronization with the existing Mission SCADA system hardware and software; 4. Site preparation and installation of the concrete mounting pad; 5. Coordination with the appropriate electrical power company to make any power transfers; 6. Modifications to the existing lift station sites including all earthwork, grading, crushed stone pad and chain link fence additions as necessary to complete each site; 7. Initial startup of each station to ensure proper operation of each generator. Work is to include a complete cycle of each lift station; 8. A full tank of fuel for each lift station; and 9. Training in the operation and maintenance of the generators.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents