Reported | 07/09/2021 12:00 AM |
Project Title | Supply and Complete Installation Standby Generator Sets at Two Sanitary Sewer Lift Stations |
Physical Address | View project details and contacts |
City, State (County) | Jefferson, GA (Jackson County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The design proposal is for the supply and installation of standby generators at the Sumitomo and Preserve sanitary sewer lift stations. Work includes, but is not limited to the following: 1. Sizing of the generators and power transfer switches, etc. to ensure proper operation of each lift station for a period of A MINIMUM of 72-hours; 2. The purchase, delivery and off-loading of each generator and transfer switch; 3. The complete installation of all items including all conduit, wiring, synchronization with the existing Mission SCADA system hardware and software; 4. Site preparation and installation of the concrete mounting pad; 5. Coordination with the appropriate electrical power company to make any power transfers; 6. Modifications to the existing lift station sites including all earthwork, grading, crushed stone pad and chain link fence additions as necessary to complete each site; 7. Initial startup of each station to ensure proper operation of each generator. Work is to include a complete cycle of each lift station; 8. A full tank of fuel for each lift station; and 9. Training in the operation and maintenance of the generators. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |