Similar Projects
Fixed Price Variable Scope Pavement Marking
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Savannah, MO 64485

Interior Painting
Renovation
Sub-Bidding
$60,000 CJ est. value
Potosi, MO 63664

Sandblasting and Painting the Public Pool
Infrastructure, Alteration
Post-Bid
Lexington, MO

Mississippi Plant Clarifier No 3 Painting
Alteration
Post-Bid
Saint Charles, MO 63301

Heman Park Pool Painting
Alteration
Results
University City, MO 63130

Painting Senior Dining Center
Alteration
Results
Florissant, MO

Exterior Building Painting Project
Renovation
Sub-Bidding
$100,000 CJ est. value
High Ridge, MO 63049

Ameren Labadie Entrance Road & Intake Structure Bridges
New Construction, Term Contract
Post-Bid
Labadie, MO 63055

500,000 Gallon Ground Storage Water Tank Painting and Repairs
Infrastructure, Alteration
Results
O Fallon, MO

Pipe Repair and Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Tipton, MO 65081

Spray Paint
Term Contract
Post-Bid
Columbia, MO

Outdoor Pool Painting and Blast
Alteration
Results
Crystal Lake Park, MO 63131

Pavement Marking (2023-2024)
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Holt, MO 64048

Athletic Field Paint Concentrated - White
Alteration
Post-Bid
Saint Louis, MO

Warrenton Industrial Park Elevated Tank Painting
Alteration
Results
Warrenton, MO

Last Updated 01/23/2023 02:32 PM
Project Title

Pavement Marking

Physical Address View project details and contacts
City, State (County) Jackson, MO 63755   (Cape Girardeau County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,431,759 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JSE0162 Route I-57, I-55 CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, PEMISCOT, PERRY, SCOTT, STE GENEVIEVE County. Pavement marking on I-55 from Jefferson County line to the Arkansas State line and on I-57 from I-55 to the Illinois State line, the total length of improvement being 370.252 miles. Range: 1M to 2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - H08 - Pavement Marking *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents