Similar Projects
Reconstruction of Dock Face Phase 3
Alteration
Bidding
$4,316,193 est. value
Toledo, OH

Ritter Park Boat Ramp Replacement Project
Alteration
Bidding
$50,000 est. value
Napoleon, OH 43545

WMC Loading Dock Expansion and Renovation
Renovation
Post-Bid
Columbus, OH

Cincinnati Riverfront Boat Dock
Infrastructure
Post-Bid
Cincinnati, OH

Port Clinton Coastal Access Plan
New Construction
Results
$5,600,000 est. value
Port Clinton, OH 43452

Point Place Levee Closure Devices Replacement and Repair
Results
Toledo, OH 43604

Vermilion East Pier Repair
Construction
$1,000,000 to $2,000,000 est. value
Vermilion, OH

2020-2023 Seasonal Dock Installation and Removal
Term Contract
Results
Sandusky, OH 44870

Mentor Lagoons Park Marina Bulkhead Replacement
Results
$500,000 est. value
Kirtland Hills, Mentor, OH 44060

Mahoning River Canoe/Kayak Livery
Results
$140,000 est. value
Leavittsburg, OH 44430

Canfield Loading Dock
Results
Less than $380,400 est. value
Columbus, OH 43201

Winton Woods Accessible Canoe/Kayak Launch
Results
Less than $125,000 est. value
Cincinnati, OH 45231

Simonds-Heller Park Paddling Ramp
Results
$106,577 est. value
Newcomerstown, OH

Knox Lake Boating Access Improvements
Results
OH

Eldon Russell Boat Launch Improvements
Results
$228,514 est. value
Burton, OH 44021

Last Updated 01/27/2022 08:40 AM
Project Title

Pymatuning North Boat Ramps Rehabilitation

Physical Address View project details and contacts
City, State (County) Andover, OH 44003   (Ashtabula County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the replacement of existing Bowers and Birches recreational boat ramps at Pymatuning Lake, replacement of the existing, adjacent seawalls with armor stone revetments and return walls for erosion protection, installation of new floats and concrete abutments on each side of the new ramps, and installation of rock channel protection at the bottom of each new boat ramp. Base Bid Item 1: Birches Boat Ramp - $250,075; Base Bid Item 2: Bowers Boat Ramp - $412,125; Alternate Bid Item 1: Floating Fishing Pier - $111,500.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents