Similar Projects
FY19 City-Wide Stormwater Box Culvert Rehabilitation
Results
Less than $1,000,000 est. value
Tampa, FL 33600

Drainage Project at Gibsonton Elementary School
Results
Gibsonton, FL 33534

Desilting and Video Inspection
Results
Less than $1,000,000 est. value

Ignacio Haya Park Living Shoreline
Results
Less than $152,876 est. value
Tampa, FL 33600

South Ditch Rehabilitation
Results
Tampa, FL 33622

Drainage Facility Improvements and Drainage Repairs
Results
Less than $1,631,929 est. value
FL

Parking Lot Drainage Project, Raymond James Stadium
Results
Tampa, FL 33607

Rental and Installation of Temporary Cofferdam at Mcmullen Loop
Results
Tampa, FL 33601

Drainage Project at Sulphur Springs Elementary School
Results
Tampa, FL 33604

Drainage Project at Carrollwood Elementary School
Results
Carrollwood, FL 33618

Stormwater Pond Maintenance
Results

District-Wide Maintenance of Mitigation Sites and Stormwater Ponds
Results

Drainage Improvement Project (Chamberlain High School)
Results
Tampa, FL 33612

Construction Services of Roadside Ditch, Canal Cleaning, and Grading Projects
Results
Less than $15,200,000 est. value
Tampa, FL 33601

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Last Updated 07/02/2020 01:33 PM
Project Title

Stormwater Culverts Construction Contract

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified contractor for the construction of Stormwater Culverts. The Contractor shall furnish all labor, materials, and equipment for the accomplishment of all work as described in the contract documents and specifications, as shown on the plans (if available), and as directed by the Project Manager in accordance with the expressed or obvious intent of the Contract. Work performed under this contract will be at various locations throughout Hillsborough County. Any work authorized under this term contract will be ordered by the County on an "as needed" basis. If available, external plan sheets, construction plan sets, or sketches may be supplied to the Contractor with the work order at the Project Manager`s discretion. The Contractor is required to render any and all infrastructure and appurtenances associated with or disturbed by the work to an operable condition as determined by the County. The Contractor will perform work on work orders, which shall be assigned as individually negotiated work orders.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents