Similar Projects
Philip Street Building Automation System (BAS) and HVAC(VAV/FP) Replacement Project
Post-Bid
Charleston, SC 29401

Hollings Cancer Center Mechanical Equipment Replacement
Post-Bid
$3,000,000 to $3,100,000 est. value
Charleston, SC 29425

Stoney Field Mechanical and Electrical Improvements
Results
$300,000 to $350,000 est. value
Charleston, SC 29401

Paint Existing Plant Equipment and Piping at Lower Wastewater Treatment Plant
Results
North Charleston, SC

Autoclave And Boiler Maintenance - Hollings Marine Laboratory
Post-Bid
Charleston, SC 29412

Craig Mechanical Room Renovation
Results
$700,000 to $800,000 est. value
Charleston, SC 29424

TOC-Mechanical Contracting Services
Alteration
Post-Bid
Charleston, SC

Replace Boiler in TTC Bldg. 510
Results
North Charleston, SC

Basic Science Building BS749 Lab
Infrastructure
Post-Bid
$100,000 to $170,000 est. value
Charleston, SC 29403

Design Build Bond Hall FCU Replacement
Results
$300,000 to $500,000 est. value
Charleston, SC 29409

Replacement of Hot Water Heaters
Term Contract
Post-Bid
Edgefield, SC 29824

Mechanical Systems Water Treatment Services
Results
Charleston, SC 29424

BSB Heat Exchanger Replacement
Alteration
Post-Bid
$200,000 to $300,000 est. value
Charleston, SC 29425

B970 Nursing Sim Lab Technology Upgrades
Alteration
Results
$100,000 to $200,000 est. value
North Charleston, SC 29418

On-Call FP Mechanical Limb Management
Term Contract, Alteration
Post-Bid

Reported 03/18/2022 12:00 AM
Project Title

BSB Chiller 6 Replacement

Physical Address View project details and contacts
City, State (County) SC 29425   (Charleston County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Replace existing 300-ton water cooled chiller, cooling tower, chilled water pump, and condenser water pump located on the 8th floor of the Basic Science Building at MUSC. Modifications to the existing equipment include relocation and /or re-routing of a portion of the chilled water lines is included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents