Similar Projects
Last Updated | 04/17/2020 10:51 AM |
Project Title | Furnish, Deliver, and Install NCWorks Career Center Signs |
Physical Address | View project details and contacts |
City, State (County) | Aberdeen, Ahoskie, Albemarle, Asheboro, Burlington, Chapel Hill, Clayton, Clinton, Concord, Dunn, Durham, Edenton, Elizabethtown, Fayetteville, Greensboro, Henderson, High Point, Kenansville, Kinston, Lillington, Lincolnton, Monroe, Mooresville, Morehead City, Mount Airy, Nags Head, Nebo, New Bern, Oxford, Pittsboro, Raeford, Raleigh, Reidsville, Roanoke Rapids, Salisbury, Sanford, Shallotte, Statesville, Troy, Wadesboro, Warrenton, Washington, Whiteville, Williamston, Winston-Salem, NC 27215 (Alamance, Alleghany, Anson, Ashe, Avery, Beaufort, Bladen, Brunswick, Buncombe, Burke, Cabarrus, Caldwell, Carteret, Chatham, Cherokee, Chowan, Cleveland, Columbus, Craven, Cumberland, Dare, Davidson, Duplin, Durham, Edgecombe, Forsyth, Gaston, Granville, Guilford, Halifax, Harnett, Haywood, Hertford, Hoke, Iredell, Jackson, Johnston, Lee, Lenoir, Lincoln, Macon, Madison, Martin, McDowell, Mecklenburg, Mitchell, Montgomery, Moore, New Hanover, Onslow, Orange, Pasquotank, Pender, Pitt, Randolph, R |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Vendor shall in good workmanlike manner perform all work in accordance with the specifications: 1. Visiting each Career Center site(s) and evaluating sign requirements (to include verifying measurements, materials, and equipment needed for a turn-key project) 2. Designing, and producing signs based on DWS guidelines 3. Obtaining approval in writing from DWS for the design of each sign at each location prior to printing any signs 4. Removing existing signs 5. Delivering and installing new signs to the Career Centers 6. Disposing of the old existing current signs, as needed 7. Restoring work area to maintain “integrity” of the space 8. Communicating with the Regional Operations Director for each Career Center prior to removing and installing any signs |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |