Last Updated 03/19/2019 03:15 PM
Project Title

Lift Station Nos 8, 12, and 23 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Lift Station No. 8: The work includes but is not limited to the demolition and replacement of the submersible pumps and base elbow, recoating the riser piping, and providing bypass pumping while all work is being performed at Lift Station No. 8. Lift Station No. 12: The work includes but is not limited to the demolition and replacement of the self-priming centrifugal pumps, jet cleaning the line, and providing bypass pumping while the work is being performed at Lift Station No. 12 Lift Station No. 23: The work includes but is not limited to the demolition and replacement of riser piping, valves, submersible pumps, miscellaneous metals, and site fencing. The work also includes rehabilitation and coating of the wet well. The contractor shall also provide bypass pumping while the work is being performed at Lift Station No. 23.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents