Similar Projects
75th Street Watermain Lining
Post-Bid
$100,000 est. value
Willowbrook, IL

Partial Site Development
Post-Bid
Lombard, IL 60148

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Valve Assessment Program
Post-Bid
Elmhurst, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

Hot-Mix Asphalt
Post-Bid
Naperville, IL

2021 Paving
Results
Clarendon Hills, IL

Hot-Mix Asphalt Surface
Post-Bid
Lisle, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

2021 Street Improvement
Post-Bid
Bloomingdale, IL

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

2021 GM Roads Program
Post-Bid
West Chicago, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

HMA Surface Removal
Post-Bid
Wood Dale, IL

Last Updated 09/06/2022 06:03 PM
Project Title

Wisconsin Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $769,689 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish the goods and/or services identified in the specifications document. or The Village of Downers Grove is accepting proposals from qualified firms to furnish the goods and/or services identified in the specifications document. The Wisconsin Avenue Drainage Improvements Project shall generally consist of the following: -Installation of soil erosion and sediment control practices, as called out on the plans. -Full depth pavement removal. -Sidewalk, and driveway removal as called out on plans. -Construction of a new proposed storm sewer system along Wisconsin Avenue along with driveway culvert replacement and cross road culvert replacement. -Re-shaping the ditches on the north and south side of the road, where specified on the plans. -Installation of new full depth pavement, driveway aprons, grind and overlay. -All other collateral work such as erosion control maintenance Note: All prospective bidders/respondents are hereby cautioned not to contact any member of the village of downers grove staff or officials other than the specified contact person. The Village Council reserves the right to accept or reject any and all bids/proposals, to waive technicalities and to accept or reject any item of any bid/proposal.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents