Similar Projects
Electric Line Right-of-Way Line Clearing
Term Contract
Sub-Bidding
Tupelo, MS 38804

Metal Halide Sporting Lights
Term Contract
Sub-Bidding
Enterprise, MS 39330

Electric Line Construction and Maintenance
Alteration
Post-Bid
$200,000 est. value
Clarksdale, MS

Ceiling and Light Replacement
Alteration
Post-Bid
Starkville, MS 39759

6115--1100Kw-1200Kw Mobile Power Generator
Term Contract
Results
Ridgeland, MS 39157

Trailer Mounted Emergency Power Generator
Alteration
Results
MS

Replace Fan Coil Units Building 1 - Mississippi State
Renovation
Post-Bid
$500,000 CJ est. value
Mississippi State, MS 39762

Bureau of Building 103-295 Electrical Infrastructure Repairs
Alteration
Results
Jackson, MS 39217

Ellisville State School Generator Addition - Administration, Midway/Dietary, and Swan Lake Building
Alteration
Post-Bid
Ellisville, MS 39437

FOC Installation
Term Contract
Results
$100,000 to $250,000 est. value

Bayou Caddy Marina Electrical Repairs
Alteration
Post-Bid
Bay Saint Louis, MS 39520

UM SOC Film Production Stage 2 Lighting
Alteration
Results
Oxford, MS 38655

East Biloxi WWTP Admin Generator
Alteration
Post-Bid
Biloxi, MS 39530

East Small Craft Harbor Electrical Hazard Mitigation Project
Alteration
Results
Pass Christian, MS

FEMA 4576 PW 293 Residential Grinders Hazard Mitigation Project
Alteration
Post-Bid
Kiln, MS

Last Updated 07/12/2023 10:10 AM
Project Title

Mississippi Data Center

Physical Address View project details and contacts
City, State (County) Jackson, MS 39216   (Hinds County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

bid bond or certified check for at least five percent (5%) Scope of demolition and removal work is indicated on drawings and specified in Section 02 41 10. B. The work includes the furnishing of all labor, materials, and equipment to complete all work shown and described in the Contract Documents (Project Manual Specifications and Drawing Set) and consists of, but is not limited to, the following building types of work: 1. Site work. 2. Selective Demolition. 3. Unit Masonry. 4. Cold-form metal framing. 5. Steel framing and decking. 6. Architectural wood casework. 7. Air and Vapor Barriers. 8. Insulation. 9. Standing seam metal roofing. 10. Metal wall panels. 11. Metal doors and frames. 12. Metal framed gypsum board wall and ceiling assemblies. 13. Suspended acoustical ceiling tiles. 14. Specialty Ceiling Systems. 15. Ceramic/porcelain tile floors and walls. 16. Resilient flooring. 17. Carpet flooring. 18. Raised access flooring. 19. Interior and exterior painting. 20. Signage, toilet accessories. 21. Plumbing.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents