Similar Projects
Widefield ADA Improvements (CDBG) Project
Infrastructure
Bidding
CO

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Bidding
Manitou Springs, CO 80829

Managed Parking
Post-Bid
Green Mountain Falls, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Palmer Lake Library Ramp
Results
Palmer Lake, CO 80133

Fountain Creek at Hanson Trailhead Project
Results
$1,750,000 to $2,100,000 est. value
Colorado Springs, CO 80903

Bus Stop Pad Replacement
Infrastructure
Post-Bid
Colorado Springs, CO

Granite Rock Trailhead Improvements
Results
Less than $50,000 est. value
Colorado Springs, CO 80907

Manitou Avenue from Park Avenue to Serpentine Drive Construction Project
Results
Manitou Springs, CO 80829

Pedestrian Crossing Installation at Sierra Madre Road
Results
Colorado Springs, CO

Homestead Trail Project
Results
Less than $100,000 est. value
Colorado Springs, CO 80917

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Upper Meadows Trail Project
Results
Less than $40,000 est. value
Colorado Springs, CO

FCF ADA Improvements - Phase 1
Results
Less than $1,500,000 est. value
Colorado Springs, CO

Old Broadmoor and Lake Roundabout Modification
Results
Colorado Springs, CO

Last Updated 02/14/2022 04:49 PM
Project Title

Patty Jewett Parking Lot Reconstruction Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80907   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed scope of work for this location includes removal and replacement of existing concrete curb and gutter and sidewalk around the existing clubhouse at the Patty Jewett Golf Course. This project will also reconstruct the existing parking lot by reclaiming the existing asphalt. Please see geotechnical report. The lot will be reconstructed to meet current ADA specifications and will also provide a new parking lay out that will increase the number of available parking spaces This project also includes the installation a new Redi-Rock retaining wall.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents