Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Thompson Crossing Elementary Chiller Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Indianapolis, IN 46239

HVAC Replacement INDOT Administration Building - Greenfield
Renovation
Sub-Bidding
$200,000 CJ est. value
Greenfield, IN 46140

Indiana School for the Deaf Building 8 HVAC
Post-Bid
Indianapolis, IN 46205

Bulldog Park Chiller Screen Wall
Alteration
Post-Bid
Crown Point, IN

2021 Intercom and HVAC Improvements
Results
Battle Ground, Lafayette, West Lafayette, IN 47909

Woodland Elementary Chiller Replacement
Alteration
Results
Lafayette, IN 47901

Kingsford Heights Elementary HVAC and Controls Upgrades
Renovation
Construction
$400,000 CJ est. value
Kingsford Heights, IN 46346

Franklin Community Schools - Northwood and Creekside HVAC Projects
Renovation
Sub-Bidding
$4,000,000 CJ est. value
Franklin, IN 46131

Services Building Mechanical Room Upgrade at Pendleton Juvenile Correctional Facility/IFA
Alteration
Post-Bid
$75,000 est. value
Pendleton, IN 46064

HVAC Retrofitting for John T Myers L&D Admin Bldg
Term Contract
Results
$25,000 to $100,000 est. value
Mount Vernon, IN 47620

Pruis Hall Air Handling Unit Replacement
Renovation
Sub-Bidding
$565,000 CJ est. value
Muncie, IN 47303

Owen Valley HS & MS Chiller and Cooling Tower Replacement
Alteration
Post-Bid
Spencer, IN 47460

NCCS New Castle HS Cooling Tower Replacement
Alteration
Results
New Castle, IN 47362

Esser 2023 Ventilation Package - Fairfield, Maplewood, Washington
Renovation
Sub-Bidding
$300,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 02/27/2023 10:43 AM
Project Title

Jasper High School HVAC Improvements Project

Physical Address View project details and contacts
City, State (County) Jasper, IN 47546   (Dubois County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Jasper High School HVAC Improvements Project The successful bidder shall, upon acceptance of it's bid, be required to procure and pay for a Contractor's Bond for Construction (Form 86A or AIA Form A312) in an amount equal to it's contract price. Such bonds shall comply with all laws of the State of Indiana governing public contracts let by governmental units. Bids should be enclosed in a sealed envelope, addressed to the School Corporation, with the name and place of business of the bidder and the project name to which the bid relates on the envelope, all as more particularly set forth in the Instructions to Bidders. Bids submitted by mail should be addressed to Dr. Tracy Lorey, Superintendent, Greater Jasper Consoilidated Schools, 1520 Saint Charles Street, Jasper, IN 47546. No bids received by fax or email will be accepted. If a bid is mailed, the post office becomes the agent of the bidder and not that of the School Corporation. Bids should be made on the form included in the Project Manual which is based on the Indiana State Board of Accounts Form 96 (Revised 2013), and shall be accompanied by an acceptable certified check, cashier's check, or bid bond, executed by the bidder and an acceptable surety company, payable to the order of the School Corporation, in an amount not less than five percent (5%) of the total bid. In the event any bidder withdraws it's bid or fails to execute a satisfactory contract or contracts and furnish a satisfactory performance bond or bonds within ten (10) days after a contract or contracts has been awarded to such bidder by the School Corporation, the School Corporation may declare it's certified check or cashier's check or bid bond forfeited to the School Corporation as liquidated damages. The School Corporation shall have the right to accept any bid within sixty (60) days after the time of opening of the bids, during which time no bids shall be withdrawn; at any time to reject any and all bids for any reason at all; and to waive all formalities or irregularities in the bidding. Contractors will be required to complete their work within a certain specified period as provided in Section 01 32 00 Progress Schedule of the specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents