Similar Projects
Academica K - 12 Charter School
New Construction
Conception
Royal Palm Beach, FL 33411

Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Charter School/EOC
New Construction - 6,970 SF
Design
Less than $5,000,000 est. value
Key West, FL 33040

Dorothy Thomas Classroom Addition - Liberty Middle School Court Cover - Vellemaire Transportation Site
Addition
Design
$5,023,000 est. value
Tampa, FL 33610

Civil Package New Maintenance Building
Renovation
Bidding
Land O' Lakes, FL

Design Build Services for Viera High School Building Addition
Addition
Bidding
Melbourne, FL 32940

Marine Science Academy/Administration Building
New Construction - 17,300 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Panama City, FL

Lake Region High School New Ag Building Project
New Construction
Sub-Bidding
Eagle Lake, FL 33839

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Braden River Middle School - Renovation and Addition
Renovation, Addition - 1,431 SF
Post-Bid
Less than $26,000,000 est. value
Bradenton, FL 34202

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Prototype Classroom Building Additions and Miscellaneous Maintenance Repair
Results
Less than $35,505,000 est. value
Largo, FL 33779

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Mulberry Senior Campus Renovation
Renovation - 177,600 SF
Construction
Less than $50,000,000 est. value
Mulberry, FL

Saint Francis Catholic Academy
New Construction - 88,200 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Gainesville, FL

Last Updated 12/14/2021 08:09 AM
Project Title

Construction of Deane Bozeman School

Physical Address View project details and contacts
City, State (County) FL   (Bay County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Permitting, Construction Start Expected March 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes: 1. New Construction to include new two-story classroom building 2. Relocate existing softball field to be adjacent to existing baseball field 3. New field house, bleachers, restrooms, dugouts, press box and concessions to support new softball field 4. New parking to be added between softball and baseball fields 5. Expand west side parking lot 6. Create new entry into football stadium 7. New parent pick-up/drop-off drive

Details

Middle/Senior High School, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents