Similar Projects
Traffic Signal Maintenance
Bidding
Pflugerville, TX

Traffic Signal Maintenance Highway:IH0035
Bidding
Less than $633,365 est. value
TX

Adding a Raised Center Median and Replacement Traffic
Post-Bid
Less than $641,756 est. value
TX

Traffic Signal Improvements
Post-Bid
TX

Traffic Control Devices
Results
Less than $746,080 est. value
TX

Traffic Signal Heads
Results
Austin, TX 78767

Signal Repair with Emergency Call-Outs Highway:FM0685
Bidding
Less than $936,747 est. value
TX

Traffic Control Devices
Results
Less than $1,074,277 est. value
TX

East Pecan Street at Biltmore Avenue Intersection Improvements
Results
Pflugerville, TX 78660

Traffic Control Devices
Results
Less than $993,386 est. value
TX

Traffic Signal Controllers
Results
Austin, TX 73301

Traffic Control Devices
Results
Less than $94,250 est. value
TX

Traffic Control Devices
Results
Less than $119,640 est. value
TX

Construction of Traffic Signals
Results
Less than $1,666,747 est. value
TX

Temp Traffic Control Devices and Roadway Pavement Marking Services
Results
Austin, TX 78701

Last Updated 07/24/2020 11:27 AM
Project Title

Corridor Mobility Program Traffic Signal Improvements IDIQ

Physical Address View project details and contacts
City, State (County) Austin, TX 73301   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally consists of providing the following services, including but not limited to the labor, supervision, administration, management, material procurement, equipment procurement, miscellaneous material and consumables to furnish, deliver, unload, store, remove from storage, construct, erect, install (attach heads, pull cable, etc.), as required in subsequent work authorizations the infrastructure for traffic signals. Infrastructure will include but may not be limited to: pole foundations, pull boxes, conduit, and cabinet foundations. Contractor to provide redline drawings for locations where construction deviates from the design plans. City of Austin staff will install the controllers, cabinets, and make final cable connections at the controllers.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents