Similar Projects
RV Parking Expansion
Addition
Design
West Chester, PA 19382

Paoli Pk Trail-Seg C
Results
$1,000,000 to $2,499,999 est. value
PA

Woodbine Road Multi-Use Trail Design/Build Limited to ADA Ramps
Results
$500,000 to $999,999 est. value
PA

Eagle Village Parking Expansion
Addition
Construction
$100,000 est. value
Chester Springs, PA 19425

Route 100 Multi-Modal Trail Exton Train Station to Chester Valley Trail and Signal Upgrades and Crossing Improvements
Results
Less than $1,200,000 est. value
Exton, PA 19341

ADA Improvements - Bob White and Swedeland Parks
Results
King of Prussia, Wayne, PA 19087

PA 82 Crosswalks
Results
$500,000 to $999,999 est. value
PA

Schuylkill River Trail
Results
$7,500,000 to $9,999,999 est. value
PA

Fricks Locks Village Trailhead
Results
$475,000 to $515,000 est. value
Pottstown, PA 19465

2020 Sidewalk Restoration Projects
Results
$600,000 est. value
Malvern, PA 19355

2020 Repaving, Curb and Sidewalk Project
Results
$1,000,000 est. value
Oxford, PA

ADA Ramps 2020 Chester and Mont Co
Results
$2,500,000 to $4,999,999 est. value

Morris Road Improvements - Cedarbrook Avenue to South Devon Avenue
Results
Wayne, PA 19087

PA 23 Sidewalk Improvement Project
Results
$250,000 to $500,000 est. value
Kimberton, PA 19442

Paoli Pike Trail Segment A
Results
$200,000 to $499,999 est. value
PA

Last Updated 10/26/2020 02:29 PM
Project Title

Construction of Stone Parking Lot

Physical Address View project details and contacts
City, State (County) Kemblesville, PA 19347   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes site work and final grading of a 0.952 acre gravel parking lot. 1. The 950 CY of “Excavation” will be field adjusted as needed to ensure that the cut/fill balances. The grade will be adjust up or down to make the cut/fill balance. 2. The stripped topsoil will be respread around the perimeter of the parking lot. 3. Given the sort duration of the project, no temporary seeding will be done. The “Seed and Mulch” line item will be used along with the “Respread Topsoil, Seed and Mulch” line item to stabilize the site.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents