Similar Projects
Lake Ballinger/Hall Creek Ecosystem Restoration
Infrastructure
Design
$10,000,000 CJ est. value
Mountlake Terrace, WA 98043

County Forces Projects - Rivershore Road Flood Repair
Infrastructure
Design
$207,595 est. value
Clearview, WA 98290

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

PWC - 236 th St. Conduit Installation and I-5 Bridge Crossing (Re-Bid 2)
Infrastructure
Bidding
$1,370,886 CJ est. value
Mountlake Terrace, WA 98043

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

Lynnwood Municipal Golf Course Irrigation Pump Station Fabrication
New Construction, Infrastructure
Bidding
$216,222 CJ est. value
Lynnwood, WA 98036

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Station 50 - Waterline Extension
Infrastructure
Results
Arlington, WA 98223

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

Seaview Park Infiltration Facility Phase 2
Infrastructure
Bidding
$495,600 CJ est. value
Edmonds, WA 98026

Last Updated 08/19/2022 03:03 PM
Project Title

Water Pressure Reduction Project - Phase 2

Physical Address View project details and contacts
City, State (County) Lynnwood, WA 98036   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,870,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The District is not responsible for any costs incurred in response to this Invitation to Bid. The project work is located in Bothell, WA and unincorporated Snohomish County, WA. The purpose of this project is to: -Install six pressure reducing valve stations and associated site piping and appurtenances. -Install approximately 900 linear feet of 12-inch ductile iron water main and approximately 430 linear feet of 8-inch ductile iron water main on 208th Street SE (SR 524) near the intersection of the Bothell. Everett Highway (SR 527). -Install approximately 40 linear feet of 8-inch ductile iron water mam on 183rd Street SE at the intersection of the Bothell Everett Highway (SR 527). -Install 18 zone isolation valves. -Furnish and install approximately 125 linear feet of 8-inch ductile iron water main at the intersection of Richmond Road and Filbert Road (SR 524) and demolish and wastehaul an existing PRV vault and ductile iron water main. -Complete modifications to five existing PRV stations including electrical, instrumentation, telemetry, programming, solenoid valves, and appurtenances required to modify the existing; PRV pilot systems in order to match the operation of the control valves at the new stations. Project work also includes temporary erosion and sedimentation control, dewatering, cathodic protection, pavement restoration, site restoration, electrical and telemetry, and other associated work items. Bids shall be submitted in accordance with the Contract Documents. Bids shall constitute offers to the District, which shall be binding for 180 days from the date of bid opening. District reserves the right to reject any bid, any portion of any bid and/or to reject all bids. The District further reserves the right, but without obligation, to waive informalities and irregularities. No bid will be considered unless accompanied by a bid guaranty (certified or cashier's check, surety bond, or postal money order) payable to Alderwood Water & Wastewater District in an amount not less than five percent (5%) ofthe Total Bid Price. The following identifies the types of subcontracting opportunities that may be available on this contract and is provided only for informational purposes. Work Categories: Landscaping and Restoration; Asphalt Grinding; Cathodic Protection; Patching and Paving; Dewatering; Electrical; Systems Integration; and Traffic Control. The District is an Equal Opportunity and Affirmative Action Employer. Small. Minority and Women-owned firms are encouraged to submit bids. All questions regarding this solicitation shall be directed to the Design Consultant: Eric Delfel, P.E., Gray & Osborne, Inc., 1130 Rainier Avenue South, Suite 300, Seattle, Washington 98144; phone number (206) 284-0860, or e-mail at edelfel@g-o.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents