Similar Projects
RFQ Construction Manager at Risk - Interdisciplinary STEM Building
New Construction, Infrastructure - 100,000 SF
Bidding
$45,000,000 CJ est. value
Marietta, GA 30060

Biosolids Handling and Disposal Services for Noonday and Northwest WRF
Term Contract
Sub-Bidding
Marietta, GA 30060

Residence And Housing Pest Control
Post-Bid
Kennesaw, GA 30144

Janitorial and Floor Maintenance Services
Post-Bid
Marietta, GA 30060

Kitchen Renovation
Renovation
Results
Atlanta, GA 30310

Georgia Veterans Education Career Transition Resource Center (VECTR)
Renovation - 10,716 SF
Results
$1,912,500 est. value
Marietta, GA 30060

New Student Housing
New Construction - 109,000 SF
Construction
$29,463,536 est. value
Kennesaw, GA 30144

Pest Control Products and Services
Term Contract
Post-Bid

Crawford Lab (Building E) Renovation
Renovation
Results
$4,350,000 est. value
Marietta, GA

Pest Control Services for Cobb County Government Facilities
Term Contract
Post-Bid
Marietta, GA

Building K Renovations - Marietta Campus
Renovation
Results
$1,400,000 est. value
Marietta, GA 30060

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Pest Control
Term Contract
Post-Bid
GA

Pest Control Services
Term Contract
Post-Bid
Cartersville, GA 30120

Janitorial and Cleaning Services and Supplies
Term Contract
Post-Bid
Kennesaw, GA 30152

Last Updated 08/09/2022 05:31 AM
Project Title

RFQ Contractor - Task Order Contractor Services for General Contractor 2022

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Kennesaw State University (hereafter "KSU" or "Kennesaw State"), A Unit of the Board of Regents of the University System of Georgia (Owner), is seeking Statements of Qualifications from firms interested in providing Task Order Contractor Services for General Contractor ( CM at Risk and/or Design-Build) for certain construction projects at Kennesaw State University. Questions relating to the RFQ must be submitted in writing via e-mail by 8-22-22 and will be answered by 8-30-22. Email address: ayakimov@kennesaw.edu. KSU reserves the right to request further documents.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents