Similar Projects
Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

CY-20 Sidewalk Program
Results
$900,000 to $1,200,000 est. value
Burlington, VT

Jericho STP BP15(10)
Results
$342,906 est. value
Jericho, VT 05465

2020 Sidewalk Spot Repairs
Results
Colchester, VT

TAP TA15(4) - Sidewalk
Results
Essex, VT

Trail Construction Adjacent to State Park Road
Results
Charlotte, VT

Hinesburg Community School Parking and Sidewalk Improvements
Results
Hinesburg, VT 05461

Cherry Street Sidewalk STP SDWK(18)
Results
Less than $300,000 est. value
Milton, VT

Burlington Greenway Construction Phase 3B North: Blanchard Beach to Proctor Place
Results
$100,000 to $300,000 est. value
Burlington, VT

CEATS Building 119 Parking Improvements
Results
Jericho, VT 05465

Colchester-Essex NH 030-1 (34)
Results
$1,000,000 to $2,500,000 est. value
Colchester, Essex, VT 05439

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Last Updated 05/06/2020 12:06 PM
Project Title

Sidewalk Replacement Charlotte Central School and Shelburne Community School

Physical Address View project details and contacts
City, State (County) Charlotte, Shelburne, VT 05445   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $97,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to remove and replace sidewalks and curbs per attached locations at both the Charlotte and Shelburne schools. 1. Contractor is responsible for removing and hauling all material off site. 2. The replacement sidewalks will be monolithic sidewalk with curb. 3. Regrade the base and add where necessary. There should be a minimum of a 4” sub base including curb. 4. The sidewalk pour should be at least 4” minimum. The concrete will be a sidewalk grade 4000 psi minimum. 5. The sidewalks will have a light broom finish. 6. The curb should be no less than 16” with no more than 6” above grade 7. All new concrete will be treated with a sealant. 8. All curb cuts will meet the ADA standards in slope. 9. All disturbed pavement will be replaced. 10. Regrade disturbed soil and seed where needed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents