Similar Projects
Resurfacing
Bidding
$6,879,936 est. value
FL

Pine Forest Drainage Improvements Project
Bidding
Tallahassee, FL

Welaunee Boulevard Segment 3B Construction Project
Post-Bid
Tallahassee, FL 32308

Richview Road Pass Construction Project
Term Contract
Post-Bid
$3,500,000 est. value
Tallahassee, FL 32301

Old Bainbridge Road Safety Improvements SR 63 to County Line and at Knots Lane
Results
Less than $552,578 est. value
Tallahassee, FL 32308

Design-Build Services for Capital Cascades Trail-Skateable Art Project
Results
Tallahassee, FL 32301

Milling and Resurfacing/Traffic Signals/Drainage Improvements
Results
Less than $1,196,186 est. value
Tallahassee, FL 32399

Road Repair for Babcock Ranch Preserve
Term Contract
Results
Less than $107,657 est. value
Tallahassee, FL 32301

Impact of Incentive/Disincentive Specifications on Long-Term Asphalt Pavement Performance
Term Contract
Results
Tallahassee, FL 32399

High Friction Surface Treatment (HFST) Synthesis for Florida Pavements
Term Contract
Results
Tallahassee, FL 32399

Resurfacing
Results
Less than $9,268,911 est. value
FL

Welaunee Boulevard Segment 3A and Segment 2 Turn Lanes Construction Project
Results
Tallahassee, FL 32308

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

Asphalt Milling and In Place Asphalt Services
Results
Tallahassee, FL 32301

Roadway Repair
Results
Less than $2,220,196 est. value
Tallahassee, FL

Last Updated 03/17/2021 11:47 AM
Project Title

Betton Road Traffic and Pedestrian Enhancement Project and Hickory and Spruce Water Main Improvements

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32301   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,678,098
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project consists of furnishing all labor, equipment and materials for roadway and underground utility construction along Betton Road from Thomasville Road to Centerville Road, Hickory Avenue, Spruce Avenue, East Chouteau Avenue and Sycamore Street. Construction may include but is not limited to asphalt paving, curb and gutter, sidewalk, drainage structures, signalization, potable water and sanitary sewer mains, irrigation system, utility relocation, and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents