Similar Projects
High Density Polyethylene (HDPE) Pipe Culvert
Bidding
Fancy Gap, VA 24328

Precast Slabs
Post-Bid
VA

140'X 32" Round Smooth Wall Pipe Appomattox Area Headquarters
Post-Bid
Appomattox, VA 24522

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Stream Bank Stabilization at Mason`s Shenandoah Parking Garage
Results
Fairfax, VA 22030

Polymer Coated Corrugated Metal Pipe - Willis and Check Areas
Post-Bid
Check, Willis, VA 24380

Storm Water Ditches at Riverheads Elementary School
Results
Staunton, VA 24401

Deep Creek Interceptor Force Main Replacement
Results
$4,183,093 est. value
Chesapeake, VA

Tusico Branch Stream Restoration
Results
Fairfax, VA

Original Building Demolition and Box Culvert Construction
Results
$6,075,000 est. value
Arlington, VA 22201

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

On-Call Rock Slope Repair
Results
Less than $6,174,000 est. value

Jetty Construction Located on Tangier Island, VA
Results
$1,000,000 to $5,000,000 est. value
Tangier, VA 23440

Plain Concrete and Storm Drainage Construction
Results
Herndon, VA

Last Updated 02/10/2021 02:23 PM
Project Title

Fairview Beach Riverbank Stabilization Project

Physical Address View project details and contacts
City, State (County) VA   (King George County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all materials, labor, tools, and equipment necessary to: 1. Remove trees, brush, and other vegetation from the existing slopes and other areas within the Limits of Work; 2. Selectively demolish existing structures; 3. Construct sections of new reinforced concrete seawalls, install drainage system behind the wall, and re-grade earthen slopes above the wall; 4. Install new and modify existing storm drain pipes; 5. Construct riprap revetments and re-grade the earthen slopes above the revetment; 6. Construct other improvements as shown on the Drawings; and 7. Provide all erosion and sedimentation control measures as shown on the Drawings.

Details

Division 01 - General Requirements, Summary of Work, Payment Procedures, Administrative Requirements, Construction Progress Documentation, Submittal Procedures, Quality Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Product Requirements, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Surveying.
Division 02 - Existing Conditions, Maintenance of Existing Conditions, Demolition, Structure Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Clearing and Grubbing, Excavation and Fill, Excavation, Erosion and Sedimentation Controls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents