Similar Projects
Level and Overlay of SR 548
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Hermanville, MS 39086

Grade, Drain, Base, Pave, and Signalization on the Hegwood Road and Lincoln Road (Phase 1)
Infrastructure
Bidding
$500,000 est. value
West Hattiesburg, MS 39402

Annual Full Depth Reclamation
Post-Bid
Southaven, MS

Industrial Park Access Road Improvements
Post-Bid
Belmont, MS

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Overlay
Results

2022 Warren County DBST Project
Infrastructure
Bidding
$200,000 est. value
Vicksburg, MS

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Intersection Improvements at Various Locations Throughout the District 6
Infrastructure
Results
MS

County - Wide Reseal Project - 2022
Infrastructure
Bidding
$400,000 est. value
Marion, MS

Bay St. Louis Citywide Paving Project Phase 4 Asphalt Roads
Post-Bid
Bay Saint Louis, MS

Mill and Overlay Approximately 8 Miles on SR 41 from SR 32 to the Pontotoc County Line
Results
MS

Base Repair, Leveling, and Slurry Seal
Infrastructure
Bidding
$215,000 est. value
Ellisville, MS 39437

Barnes Road Overlay and Striping Project
Infrastructure
Post-Bid
Carthage, MS 39051

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

Last Updated 06/16/2022 11:52 PM
Project Title

Mill and Overlay

Physical Address View project details and contacts
City, State (County) Crystal Springs, MS   (Copiah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill & Overlay approximately 13.5 miles of US 51 from the Lincoln County Line to south of SR 28 & approximately 0.5 miles of SR 850 from US 51 to the EOSM & Overlay approximately 0.6 miles of SR 848 from US 51 to the EOSM, known as State Project Nos. SP-2177-00(014) / 108933301, SP-0315-00(003) / 108933302 & SP-2177-00(015) / 108933303 in Copiah County

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents