Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

Sewer Line Replacement - Seaside Wastewater Force Main
Renovation, Infrastructure
Design
$8,236,619 CJ est. value
Ventura, CA 93001

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Pumping Station Replacements
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Tulare, CA 93274

Lift Station Improvements - 304k15 - City of Morgan Hill
Renovation
Conception
$3,100,000 est. value
Morgan Hill, CA 95037

Sewer Condition Assessment/Lift Station And Force Main - 13SR001 - City of Lancaster
Renovation
Conception
$1,050,000 est. value
Lancaster, CA 93535

Murphy Hills Pump Station - City of Whittier
Renovation
Conception
$2,000,000 est. value
Whittier, CA

Washington Pump Station Replacement - City of Whittier
New Construction
Conception
$2,393,000 est. value
Whittier, CA 90603

Rio Cosumnes Correctional Center - Sewer Grate Before S21 Pumping Station - P148217 - Sacramento County
Infrastructure
Conception
Less than $560,000 est. value
Elk Grove, CA 95757

River Pumping Station Rehabilitation - 7690 - City of Antioch
Renovation, Infrastructure
Conception
$1,100,000 CJ est. value
Antioch, CA 94509

1000 Rollins Pump Station Recommended Improvements - City of Burlingame
Renovation
Conception
$3,291,000 est. value
Burlingame, CA

Balboa Island Drainage MP/Pump Stations - City of Newport Beach
Infrastructure
Conception
$20,000,000 CJ est. value
Newport Beach, CA 92663

Zone 3 And 4 Pump Station Upgrades - 23WXX - City Of Newport Beach
Renovation
Conception
$1,784,000 CJ est. value
Newport Beach, CA 92625

Last Updated 05/05/2023 11:37 AM
Project Title

Diversion Facility Upgrades

Physical Address View project details and contacts
City, State (County) Placerville, CA 95667   (El Dorado County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $805,730 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 12,2023 this project has not yet been awarded. A timeline for award has not yet been established.** The Project consists of moving the compressors out of the existing building to where the compressor tanks are and then enclosing the compressor tanks and compressors in a new enclosure. Additionally, the backup generator will be updraded and moved to a new location at the site. Bidding Documents contain the full description of the Work. Engineer’s Estimate is $580,000 Questions regarding this project should be directed to the Project Manager by emailing Mr. Jon Money at jmoney@eid.org, or by calling 530.642.4090. A California Classification A contractor's license is required Questions regarding this project should be directed to the Project Manager by emailing Mr. Gary Mutschler at cmutschler@eid.org, or by calling 530-642-4182. PUBLIC WORKS LAWS. The project is a public works project subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). To be qualified for this project, a contractor must be registered with the DIR. In addition, pursuant to prevailing wage laws, copies of the prevailing wage rates are on file at the District's principal office and are available on request.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents