Similar Projects
Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Lone Tree Creek Regional Trail Phase 1B
Infrastructure
Post-Bid
Centennial, CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

25th Avenue Pedestrian Boulevard Construction
Infrastructure
Post-Bid
$900,000 to $1,049,700 est. value
Aurora, CO 80040

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Last Updated 08/31/2021 06:57 AM
Project Title

2021 Trails Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid for the 2021 Trails Rehabilitation Project. Concrete construction of 2 existing trails in Greenwood Village.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents