Similar Projects
Greeley Park Improvements - City of Nashua
New Construction, Infrastructure
Conception
$500,000 est. value
Nashua, NH 03064

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

500 Seat Capacity Bleachers Newport Middle High School
Addition
Post-Bid
Newport, NH - Newport, VT

Construction of the Whitewater Park at Franklin Falls
Results
$1,500,000 to $2,000,000 est. value
Franklin, NH

Park and High Street Improvements
Results
Wolfeboro, NH

Running Track Reconstruction
Renovation
Post-Bid
$300,000 est. value
Nashua, NH 03062

Tennis Court Maintenance
Results
Rochester, NH 03867

Main Play Structure
Renovation
Post-Bid
Dover, NH

Prout Park Improvements
Results
Manchester, NH

Tennis Courts Reconstruction
Renovation
Post-Bid
$200,000 est. value
Keene, NH 03431

Rock Rimmon Park Improvements - Phase 2
Results
Manchester, NH

2021 Valley Cemetery Maintenance Building and Civic Park Recreation Building Project
Results
Lebanon, NH

Tennis Court Repair and Resurfacing
Results
Merrimack, NH

Resurfacing High School Track
Results
Conway, NH

Recreation Playground Shade Structures
New Construction
Results
Barrington, NH

Last Updated 06/17/2022 11:16 AM
Project Title

Water Park Development City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected April 2024
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a playground / park / athletic field in Nashua, New Hampshire. Conceptual plans call for site work for a playground / park / athletic field. The development of a Splash Pad/Water Park would provide summer activity for many children of the City. The idea would be to build this water park next to Rotary pool. Building at this location would allow the water park to utilize the sanitation system already in place at the pool, the restrooms that already exist, and the supervision (lifeguards). Taking advantage of the existing infrastructure would make the project affordable and would provide a high level of service to the community. As of June 16, 2022, this project is currently in the FY 2023-2028 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Fountains, Exterior Fountains.
Division 22 - Plumbing, Operation and Maintenance of Plumbing, Operation and Maintenance of Pool and Fountain Plumbing Systems, Commercial Plumbing Fixtures, Wash Fountains, Pool and Fountain Plumbing Systems, Fountain Plumbing Systems, Fountain Piping, Fountain Pumps, Fountain Equipment Controls.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents