Similar Projects
Lime Sludge Handling Process - City of Margate
Infrastructure
Conception
$5,000,000 CJ est. value
Margate, FL 33063

West Central Boulevard Wet Pond - SW-6 - City of Cape Canaveral
Infrastructure
Conception
$2,500,000 CJ est. value
Cape Canaveral, FL 32920

Structure Demolition
Demolition, Infrastructure
Design
$200,000 CJ est. value
Bunnell, FL 32110

2022-NFWF-Wetland Restoration
Infrastructure
Bidding
$300,000 CJ est. value
Cape San Blas, FL 32456

Intracoastal Waterway Jacksonville to Miami - Maintenance Dredging, 12- Foot Project, Palm Valley, South Reach
Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Jacksonville, FL 32202

Manatee Harbor, Maintenance Dredging, 40-foot Project, Entrance Channel, Turning Basin, and South Access Channel, Manatee County
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Bradenton, FL 34211

Storm Damage Assessment
Term Contract
Post-Bid
Tavernier, FL

Mold Remediation
Alteration
Post-Bid
Hollywood, FL 33021

Environmental Services
Term Contract
Results
Jacksonville, FL

Water Monitoring Services, Term Contract
Term Contract
Results
Ocala, FL

MLK Demolition
Demolition, Infrastructure
Construction
$250,000 CJ est. value
Panama City, FL 32401

Mold Remediation
Renovation
Construction
$11,250 CJ est. value
Gainesville, FL 32601

International Drive Wet Pond - SW-5 - City of Cape Canaveral
Infrastructure
Conception
$300,000 CJ est. value
Cape Canaveral, FL 32920

Cc D Third Floor Demolition
Demolition, Infrastructure
Sub-Bidding
$2,226,635 CJ est. value
Miami, FL 33142

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Last Updated 11/18/2022 12:37 AM
Project Title

Removal and Replacement of Post Tensioning (PT) Bars

Physical Address View project details and contacts
City, State (County) Cross City, FL 32628   (Dixie County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,610,617 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Dixie Road Name: Removal and Replacement of Post Tensioning (PT) Bars Limits: Midpoint Project(s): 41022137221(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 280 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 00 Days (acq. time) Remove and replacement of existing post-tensioning (PT) bars (92 total) in multiple spans of the twelve deficient sonovoid slab unit decks along US 19. The Contractor is responsible for providing all associated maintenance of traffic ("MOT") for US-19, intersecting roadways and for providing all incidentals including, without limitation as necessary to restore the bridges to substantially the same condition as existed prior to the removal of the existing PT bars. Services will begin upon execution of the contract and as directed by the Department's Program Manager. The initial site visit, and field work to remove and replace the PT bars shall be performed within 280 calendar days of execution of this task work order.Lump Sum. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects unless noted otherwise in the project specifications. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 008 - Removal and Replacement of Post Tensioning (PT) Bars

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents