Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

SWC - ADA Upgrades - Phase 3
Infrastructure
Bidding
Less than $500,000 est. value
NC

Downtown Streeteries
Infrastructure
Bidding
Raleigh, NC 27601

Navaho Drive Sidewalk Project (Formal)
Post-Bid
Raleigh, NC 27602

Carolina Pines Parking Lot Repair
Post-Bid
Less than $200,000 est. value
Raleigh, NC 27601

Bike, Sidewalk and Pedestrian Improvements
Results
Less than $1,090,168 est. value
Cary, NC 27513

Knightdale Elementary School Pedestrian and Parking Improvements
Results
Less than $146,821 est. value
Knightdale, NC 27545

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Facility Parking Lots Rehab
Infrastructure
Bidding
Apex, NC

Fox Road Pedestrian Crossing
Post-Bid
Raleigh, NC 27616

Group 3 Sidewalk Improvement Project
Results
$619,948 est. value
Raleigh, NC 27601

R-5785I ADA Ramps
Infrastructure
Bidding
NC

Sidewalk Panel Demolish and Replace Contract
Post-Bid
Raleigh, NC

Pedestrian Connection Improvements - Phase 2
Results
Raleigh, NC 27601

East Young Street Sidewalk Extension - Phase 2
Infrastructure
Bidding
Rolesville, NC

Reported 02/09/2022 12:00 AM
Project Title

Lake Lynn Loop Trail Repaving

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27613   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists generally of the following major items: The project is located at 3200 Lake Lynn Road approximately 700 feet east of the Leesville Road and Lynn Road intersection. Coordinates to the project area are 35°52’19.27”N, 78°41’53.09”W. The purpose of the project is to repave and improve the eastern side of the Lake Lynn Loop Trail from the east side of the dam to the boardwalk connected to the trail to the Lake Lynn Community Center. The primary goal for the project is to widen the pavement to 10’, repave asphalt trail, and improve drainage patterns.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents