Similar Projects
Stormwater Infrastructure Replacement Projects on an Annual Contract
Term Contract
Results
Less than $5,000,000 est. value
Lawrenceville, GA

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Henry Terrace Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

1291 Creek Wood Cove Storm Drain System Replacement
Post-Bid
Lawrenceville, GA

363 Downing Street Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

Church Street Stormwater Improvements CDBG
Bidding
Buford, GA 30518

181 Hanarry Drive and Blake Court Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

105 Grayland Place Storm Drain Improvement Project
Post-Bid
Lawrenceville, GA

Cured-In-Place Storm Pipe Relining Project
Results
Norcross, GA 30071

Trenchless Stormwater Pipe Rehabilitation on an Annual Contract
Term Contract
Results
Less than $5,140,939 est. value
Lawrenceville, GA 30046

209 King Arthur Drive Storm System Improvement
Post-Bid
Lawrenceville, GA 30046

1140 Grayland Hill Trail Storm Drain Replacement
Post-Bid
Lawrenceville, GA

Closed-Circuit Television (CCTV) Storm Drain Pipe Inspection on an Annual Contract
Term Contract
Results
Less than $67,500 est. value
Lawrenceville, GA

241-301 Hanarry Drive (North) Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

650 Hurricane Shoals Road Storm Drain Replacement
Post-Bid
Lawrenceville, GA

Reported 02/22/2019 12:00 AM
Project Title

1021 Stone Mill Way Storm Drain Outlet Protection

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work to be performed by the Contractor consists of but is not limited to the following major items: 1. To install complete reinforced concrete dissipator slab as per the drawings. 2. Clean out and reshape existing stormwater ditch to ensure positive flow to Pew creek. 3. Additional storm pipe repair work on Stone Mountain Street as per the drawings. 4. All work shall comply with all Federal, State, and local requirements and specifications. 5. The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia. 6. Department of Transportation shall govern the construction of this project..
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents