Similar Projects
Bay Park Sewage Treatment Plant Permanent Hot Water/Chilled Water Piping System
Alteration
Bidding
East Rockaway, NY 11518

General Construction, Plumbing Construction , HVAC Work, and Electrical Construction Work
Renovation, Alteration
Bidding
Bellmore, NY

Laundry Exhaust Duct Cleaning
Alteration
Post-Bid
NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Vestibule and Reading Room Window Replacement and HVAC Upgrades
Alteration
Results
$350,050 est. value
Bellmore, NY 11710

Tully Park HVAC Improvements
Alteration
Results
New Hyde Park, NY 11040

Mechanical System Upgrade for Firing Range
Term Contract
Post-Bid
Great Neck, NY 11024

Replacing Steam Condensate Pipes
Term Contract
Results
Kings Point, NY 11024

New HVAC System Equipment and Installation
Alteration
Post-Bid
Hempstead, NY

Maintenance and Repair of HVAC Equipment and Associated Automatic Temperature Controls
Alteration
Results
Hempstead, NY

Heating and Air Conditioning Periodic Maintenance
Term Contract
Post-Bid
Oyster Bay, NY

Village Hall HVAC Replacement
Alteration
Results
Rockville Centre, NY 11570

A/C Units Maintenance
Term Contract
Post-Bid
Hempstead, NY

Garden City Public Library HVAC System Replacement
Alteration
Results
Garden City, NY 11530

HVAC Service
Term Contract
Post-Bid
Oyster Bay, NY

Reported 03/08/2022 12:00 AM
Project Title

Fulton Hall Boiler Replacement

Physical Address View project details and contacts
City, State (County) Kings Point, NY 11024   (Nassau County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Fulton Hall Boiler Replacement: Businesses with 7 + years' experience that can provide mechanical services to remove two (2) existing hot water heating boilers and replace with four (4) new boilers: - Boiler Removal - Disassemble, remove, and dispose of Boiler # 1 and Boiler #2. - Temporary Piping - A temporary 6” piping exists as part of the boiler rental configuration. This piping is to remain in place as a back-up until the new boilers are installed. Once the existing boilers are removed and the new boilers are installed, the temporary piping, hangers, and associated cabling is to be disconnected and removed. - Boiler Replacement - Coordinate the footprint of the new boilers and associated access requirements with the existing pads and extend the (2) 6” boiler pads as required. Provide and install a fully functional primary hot water plant including (4) natural gas fired high mass, high mass nominal 6,000 MBH fire tube high efficiency condensing boilers. - Other - Provide a full warranty for the new boiler system for parts and labor for two (2) years. The contractor shall have an approved boiler manufacturer repair service provider located within a 50-mile radius of the USMMA campus capable of responding to service calls. - Provide five (5) 8-hour days of training for USMMA personnel by October 1, 2022 in preparation for the fall heating season.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents