Similar Projects
Curb Repair and Street Resurfacing
Bidding
De Pere, WI

Sharon Hall Aluminum Handicap Ramp
Bidding
Sharon, WI

Streetscape Materials
Post-Bid
Milwaukee, WI 53202

Parking Lot Renovation
Post-Bid
Milwaukee, WI 53205

Boardwalk Replacement
Results
De Forest, WI 53532

City Owned Parking Lot Rehabilitation - East Lawn Cemetery
Results
Beloit, WI 53511

Academy Parking Lot Reconstruction
Bidding
Less than $270,000 est. value
Fort McCoy, WI

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

Commercial Street Reconstruction
Bidding
Bangor, WI 54614

Parking Lots, Curbs, and Exterior Lighting - General
Post-Bid
$570,000 est. value
Madison, WI 53718

Privately Owned Vehicle Parking Improvements - MEP Bidders
Results
$878,000 est. value
Marshfield, WI

Wisconsin Avenue Sidewalk
Bidding
Grand Chute, WI

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

Last Updated 11/12/2020 05:18 AM
Project Title

Great Headwaters Trail 3 and 2

Physical Address View project details and contacts
City, State (County) Phelps, WI 54554   (Vilas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: Great Headwaters Trail 3 – Song Hill Lane to Military Creek Approximately 7,000 feet of multi-use trail construction including: clearing & grubbing, excavation common, riprap and geotextile, base aggregate dense, asphaltic surface, aggregate surface, safety railing, culvert pipe, signs & pavement marking, erosion and sedimentation controls, traffic control, and turf restoration. Project B: Great Headwaters Trail 3 – Military Creek to Downtown Phelps Approximately 2,700 feet of multi-use trail construction including: clearing & grubbing, excavation common, riprap and geotextile, base aggregate dense, asphaltic surface, aggregate surface, safety railing, culvert pipe, signs & pavement marking, erosion and sedimentation controls, traffic control, and turf restoration. Project C: Great Headwaters Trail 2 – Twin Haven Lane to Long Point Road Approximately 4,000 feet of aggregate surfacing on existing multi-use trail including: prepare foundation for surface aggregate and surface aggregate stone.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents