Similar Projects
Roadway Minor Rehab - SR 14
Alteration
Design
$1,562,000 est. value
Salem, OH 44460

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Aintree Park Drive Median Removal and Garden Drive Pavement Improvement
Infrastructure
Bidding
$150,000 est. value
Mayfield, OH

2021 Road Work
Post-Bid
Springfield, OH 45501

Tar and Chip Approx. 4.08 Miles of Various Township Roads
Infrastructure
Post-Bid
Rudolph, OH

WOO-SR65 / Lime City / Colony
Results
Less than $1,403,016 est. value
Rossford, OH

Parks and Cemetery Microsurfacing Program 2021
Results
Less than $142,951 est. value
Defiance, OH

Chip and Seal
Infrastructure
Post-Bid
Tuscarawas, OH

TRU - Phoenix Road Improvements
Results
Warren, OH

Tiffin Street Resurfacing
Infrastructure
Post-Bid
New Washington, OH 44854

Two Lane Resurfacing - SR 687-00.91
Results
OH

Black Sea Road Phase 3 Project
Infrastructure
Post-Bid
OH

2021 Linear Grading
Results
$136,150 est. value
Wooster, OH 44691

Township Road 50 Improvement
Alteration
Post-Bid
Galion, OH 44833

Runkle Road Paving 2021
Results
$612,194 est. value
Urbana, OH 43078

Last Updated 07/11/2022 06:37 AM
Project Title

South Hartford Avenue Improvements, Phase 2 (Part 1) and Church Street Resurfacing (Part 2)

Physical Address View project details and contacts
City, State (County) Centerburg, OH   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $259,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Part 1 South Hartford Avenue Improvements, Phase 2: The project consists of the removal (milling) of the existing asphalt surface down to the brick base and resurfacing from south of Church Street to south of Dally Street, a distance of approximately 1,530 feet. In addition to the resurfacing, the work will include any necessary base repairs, the installation of three new curb ramps, and the replacement of seven catch basins, as well as related work. Part 2 Church Street Resurfacing: The project consists of milling and resurfacing Church Street from South Preston Street to the dead end, a distance of approximately 525 feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents