Similar Projects
Science & Design Center Addition
Addition
Design
Rye, NY 10580

The Learning Experience
Build-Out - 9,998 SF
Post-Bid
Orangeburg, NY 10962

Kingston City School District - Capital Improvements
Post-Bid
Less than $10,800,000 est. value
Kingston, NY 12401

Troy Enlarged City School District - Reconstruction at Multiple Buildings Phase 2
Results
Troy, NY 12180

High School Building D Renovations, Seely Elementary Toilet Renovations & Greenville Elementary Ceiling Abatement and Tile Replacement
Renovation
Results
$845,000 est. value
Scarsdale, NY 10583

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Parsons Memorial Elementary School Additions and Alterations
Addition - 4,167 SF
Construction
$3,850,000 est. value
Harrison, NY 10528

Saint Thomas Aquinas Church School
Addition
Pending Verification
Binghamton, NY 13905

Salzman School
New Construction - 1,344 SF
Pending Verification
Less than $500,000 CJ est. value
Hartwick, NY 13810

Capital Improvements Project at the Johnson City Central School District K-8 Elementary Middle School, High School and Bus Garage Properties
Post-Bid
Less than $18,640,000 est. value
Johnson City, NY 13790

Menands UFSD 2016 Capital Project
Results
$7,205,000 est. value
Menands, NY 12204

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Buffalo Public Schools - School 66 North Park Community School
Renovation, Addition - 13,700 SF
Post-Bid
Buffalo, NY 14216

Saint Regis Falls CSD Capital Project
Results
Saint Regis Falls, NY 12980

Reconstruction of Rhinebeck Chancellor Livingston Elementary School, Rhinebeck Middle School/High School
Construction
Rhinebeck, NY 12572

Reported 12/09/2019 08:38 AM
Project Title

2017 Capital Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Conklin, NY   (Broome County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $2,550,000 to $2,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brookside Elementary: Renovations include masonry restoration of exterior brick veneer, ceiling abatement and replacement with ACT, abatement of VAT finish materials and replacement with VCT flooring, interior door replacement, gymnasium operable partition replacement, classroom casework replacement; Mechanical renovations including air terminal equipment replacement and installation of water heater; Plumbing renovations including fixture replacement and distribution system modifications; Electrical renovations including classroom lighting replacement, power distribution modifications, main service and gear replacement, and data system modifications; including all associated appurtenances. Donnelly Elementary: Renovations include masonry restoration of exterior brick veneer, ceiling abatement and replacement with ACT, abatement of VAT finish materials and replacement VCT flooring, interior door replacement, gymnasium operable partition replacement, classroom casework replacement, terrazzo flooring repair, metal roof deck replacement; Mechanical renovations including air terminal equipment replacement; Plumbing renovations including backflow device installation, fixture replacement and distribution system modifications; Electrical renovations including classroom lighting replacement, power distribution modifications, main service and gear replacement, and data system modifications; including all associated appurtenances. Brookside Bus Storage: Renovations include modifications to the fire alarm system including all associated appurtenances. Contract No. 1 General Construction (Brookside Elementary) - $600,000 - $650,000 Contract No. 2 General Construction (Donnelly Elementary) - $350,000 - $400,000 Contract No. 3 Mechanical Construction - $200,000 - $225,000 Contract No. 4 Electrical Construction - $750,000 - $775,000 Contract No. 5 Plumbing Construction - $250,000 - $275,000 Contract No. 6 Asbestos Abatement Construction (Brookside Elementary) - $350,000 - $400,000 Contract No. 7 Asbestos Abatement Construction (Donnelly Elementary) - $50,000 - $75,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents