Similar Projects
DCEO RIF Sidewalk Improvements
Infrastructure
Bidding
Carbondale, IL

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Bidding
Lansing, Tinley Park, IL 60438

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Lot Repairs at Champaign Sign Shop
Post-Bid
Champaign, IL 61820

Construct A Pedestrian Underpass From Burlington Avenue, Through the BNSF Railway Embankment
Results
Western Springs, IL 60558

(3.10 Mile) Overlay, Pedestrian Ramp New Hma Shoulders On Il- 173 Shoulders On Il- 173 From Green Bay Rd To Sheridan Rd . Drainage Improvement Between Hebron Ave. And Galilee Ave. In The City Of Zion.
Results
Zion, IL

2021 Sidewalk and Curb Maintenance Program
Alteration
Bidding
$120,000 est. value
West Chicago, IL

A/E Services For Repair/Resurface Roadways And Sidewalks
Renovation
Post-Bid
Less than $6,600,000 est. value
Springfield, IL 62794

Parking Lots - Nerge Lift, Huntington Lift & Greenleaf Pump Stations
Results
$50,529 est. value
Elk Grove Village, IL 60007

Commerce Drive Reconstruction
Infrastructure
Bidding
$780,000 est. value
West Chicago, IL

2021-2022 Miscellaneous Repair Contract
Term Contract
Post-Bid
Urbana, IL

Union Ridge Elementary School Parking Lot Improvements
Results
Harwood Heights, IL 60706

Sidewalk Replacement Garden Homes
Alteration
Bidding
Rock Falls, IL 61071

Heritage Bluffs Golf Club Cart Path
Post-Bid
Channahon, IL 60410

Greenfield Park Pathway Improvements
Results
Northbrook, IL 60062

Last Updated 06/18/2021 12:06 PM
Project Title

Evergreen Park Accessibility Improvements (PB-2005 and SP2102)

Physical Address View project details and contacts
City, State (County) Carbondale, IL 62903   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PB2005 — Evergreen Park Accessible Restrooms SP2102 — Evergreen Park Accessibility Improvements (Paving and Parking Lots) 1. HMA Paving, Concrete Paving, Sidewalks & Appurtenances: on or before August 13, 2021 or 30 working days, whichever is later. 2. Restrooms and Appurtenances: on or before October 1, 2021 (pending timber truss lead time, if applicable). This project includes the demolition and re-construction of two existing masonry restroom buildings, sidewalks, hot-mix asphalt paving, concrete paving, bumper blocks, signs, pavement markings, and appurtenances.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents