Similar Projects
Hope Downtown Streetscaping (Tap-19) (S)
Infrastructure
Bidding
$500,000 to $700,000 est. value
Hope, AR

Installation of Adaptive Signal Control Technology
Infrastructure
Bidding
$400,000 est. value
Conway, AR 72034

Corrugated Steel Pipe and Bands
Post-Bid
Hamburg, AR

Drainage Improvements
Infrastructure
Post-Bid
Ward, AR

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Reclamation of AML Montreal Gob Pile
Infrastructure
Results
Huntington, AR 72940

Ramsey Village Apartments
New Construction, Alteration
Pending Verification
$21,000,000 est. value
Fayetteville, AR 72704

Reclamation of Brotherton Highwall
Infrastructure
Post-Bid
Branch, AR

Riverfront Drive Culvert Repair
Infrastructure
Results
$7,500 est. value
Little Rock, AR

Rockport Walking Trail
Infrastructure
Post-Bid
Rockport, AR

Missouri Creek Drainage Improvements
Infrastructure
Results
Fayetteville, AR

Hatcher Lake Road Drainage Project
Infrastructure
Post-Bid
AR

Drainage Improvements at the Searcy Municipal Airport Contract II
Infrastructure
Results
Searcy, AR 72143

Nashville - 4th Street Sidewalks Phase 2
Infrastructure
Post-Bid
Nashville, AR

Repair Asphalt Parking Lot at WCCC
Term Contract
Results
Little Rock, AR

Reported 07/01/2022 12:00 AM
Project Title

Construct a Parking Lot at the Blytheville Elementary School

Physical Address View project details and contacts
City, State (County) Blytheville, AR 72315   (Mississippi County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following: Furnishing the material, labor, and equipment necessary to construct a new 16,000 sq. ft. asphalt parking lot with curb and gutter sidewalks, and drainage.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents