Similar Projects
Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements
Results
MN

Jonathan Carver Parkway
Results
Chaska, MN

2021 Crack Sealing
Post-Bid
MN

CSAH 50 Safety Improvements / CSAH 43 Mill and Overlay
Results
$2,500,000 to $5,000,000 est. value
Cologne, MN

2021 Infrastructure Improvements
Results
Waconia, MN

2021 Infrastructure Improvements
Results
Waconia, MN

2021 Sealcoating
Results
$63,000 to $70,000 est. value
Chanhassen, MN

TH 212 Reconstruction - CSAH 36 to CSAH 11
Results
Cologne, MN

2021 Mill and Overlay
Results
$600,000 est. value
Watertown, MN

2021 Overlay Program
Post-Bid
MN

2021 Trail Sealcoat
Post-Bid
Belle Plaine, Eagan, Elko, Jordan, New Market, Prior Lake, Savage, Waconia, MN

2021 Street Improvements
Results
Mayer, MN

Oak Lane Improvements
Post-Bid
$882,403 est. value
Norwood Young America, MN 55397

Microsurfacing and Fog Seal
Bidding

North Smoky Hills Graveling
Renovation
Post-Bid

Reported 04/14/2021 12:00 AM
Project Title

3rd Avenue Mill and Overlay and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Watertown, MN   (Carver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 4,680 SY of Milling, 110 SY of Asphalt Removal, with 530 Ton of Asphalt Concrete, 305 SY of Concrete Pavement Removal, 325 LF of Curb and Gutter Removal, 325 LF of Curb and Gutter Installation, 525 SY of 4” Non-reinforced PCC Pavement, 190 SY of 6” Non-reinforced PCC Pavement, 125 Ton of Base Course, 150 SF of Detectable Waring Panels, 17 Inlet Protections Installations, 45 CY of Topsoil, 270 SY of Seeding, Fertilizing, and Mulching, 6 Adjustments to Manhole Lid and Frames and Removal of 7 Trees, Shrub and Stump.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents