Similar Projects
Last Updated | 02/16/2022 02:32 AM |
Project Title | Reconstruction - Bridge Deck Replacement |
Physical Address | View project details and contacts |
City, State (County) | IA (Pottawattamie County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 Design No. 0125; 155’-6 x 40’ Pretensioned Prestressed Concrete Beam Bridge - Imx-029- 3(262)56--02-78 0002 Design No. 0225; 155’-6 x 40’ Pretensioned Prestressed Concrete Beam Bridge - Imx-029-3(262)56--02-78 0003 Roadway Items - Imx-029-3(262)56--02-78 0004 Design No. 0325; 461’-0 x Variable Width Continuous Steel Beam Bridge - Imx-029-3(264)56--02-78 0005 Roadway Items - Imx-029-3(264)56--02-78 25th St 1.0 Mi s Of n 16th St In Council Bluffs (Nb/Sb) 17.80 Ton Asphalt Binder 2.00 Lump Sum Construction Survey 264.00 Linear Foot Culvert Pipe 3,890.00 Cubic Yard Embankment-In-Place 106.00 Cubic Yard Excavation Class 20 275.00 Ton Granular Shoulders, Type a 375.00 Linear Foot Guardrail, Formed Steel Beam 296.90 Ton Hot Mix Asphalt 2,089.40 Square Yard Longitudinal Grooving In Concrete 646.20 Square Yard Paved Shoulders 730.39 Station Pavement Markings 2,693.00 Square Yard Pavement Scarification 688.00 Linear Foot Rail, Concrete Barrier 5,492.00 Pound Reinforcing Steel 134,150.00 Pound Reinforcing Steel, Epoxy Coated 3,045.90 Square Yard Removal Of Pvmnt/Drives/Sdwk 3.00 Station Shoulder Construction 2.90 Station Shoulder Finishing 1,536.40 Ton Special Backfill 4.00 Each Steel Beam g'Rail Barrier Trans Section 434.30 Cubic Yard Structural Concrete 1,696.00 Pound Structural Steel 300.00 Linear Foot Temp. Barrier Rail 600.00 Cubic Yard Topsoil, Strip/Salvage/Spread Imx-029-3(264)56--02-78 Route: i-29 Cc Rr 2.1 Mi n Of Us 6 In Council Bluffs (Sb) 1.00 Lump Sum Construction Survey 521.00 Cubic Yard Embankment-In-Place 43.00 Cubic Yard Excavation Class 20 175.00 Linear Foot Guardrail, Formed Steel Beam 3,151.40 Square Yard Longitudinal Grooving In Concrete 323.20 Square Yard Paved Shoulders 953.90 Linear Foot Rail, Concrete Barrier 7,033.00 Pound Reinforcing Steel 279,204.00 Pound Reinforcing Steel, Epoxy Coated 1,124.30 Square Yard Removal Of Pvmnt/Drives/Sdwk 1.40 Station Shoulder Construction 1.60 Station Shoulder Finishing 135.80 Ton Special Backfill 2.00 Each Steel Beam g'Rail Barrier Trans Section 695.80 Cubic Yard Structural Concrete 417.00 Cubic Yard Topsoil, Strip/Salvage/Spread |
||||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |