Similar Projects
Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Smithfield Wastewater Treament Plant and Pump Stations Rehabilitation
Renovation
Bidding
$4,125,515 est. value
OH

East Sparta Lift Station Replacement
Renovation
Bidding
$998,015 est. value
OH

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Portsmouth Local Protection Project
Post-Bid
$10,000,000 est. value
Portsmouth, OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

S.R. 45 Corridor Improvements Final Site Work - Water Booster Pump Station
Renovation
Bidding
$536,700 est. value
Lordstown, OH 44481

Replace and Construct Type III Hydrant Fuel System
New Construction, Demolition
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Grange Hall Booster Pump Station Improvements and Indian Ripple Booster Pump Station Improvements
Renovation
Bidding
$1,500,000 est. value
Beavercreek, Xenia, OH 45430

Replacement of Switch Gear to Flood Water Pump Station #6
Post-Bid
Ironton, OH

Reported 04/20/2022 12:00 AM
Project Title

Lift Stations Telemetry Upgrade Contract 1 - 2022

Physical Address View project details and contacts
City, State (County) Athens, OH   (Athens County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Replacing existing proprietary controllers with PLC panels and separating the Lift Station Telemetry System from the Water Telemetry System. A new Master will be set up at the Wastewater Treatment Plant.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents