Similar Projects
Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Six Month Contract for PVC Water Distribution Pipe
Term Contract
Bidding
CO

Candelas Community Commercial Parcels, Candelas Medical Phase 2 Utilities Project
Post-Bid
Arvada, CO

East Chestnut Waterline Replacement
Post-Bid
Sterling, CO 80751

Scrub Oak Circle Waterline Replacement
Results
Monument, CO 80132

Iowa Place Water Line Remove and Replace
Results
Lakewood, CO

New Fire Station Utility
Construction
Falcon, CO 80831

ML 47 Improvement Project
Construction
$730,000 est. value
Clifton, CO 81520

Cellular Domestic Water Meter Installation
Bidding
Colorado Springs, CO

Construction and Installation of a Meter Vault
Post-Bid
Monument, CO 80132

Pueblo Water - Concrete Meter Vaults, Manholes and Accessories 2020-2021
Term Contract
Results
$20,000 to $50,000 est. value
Pueblo, CO 81003

Monument Raspberry Lane Street and Waterline Improvements
Bidding
Monument, CO 80132

Repair Utilities - Falcon Stadium
Post-Bid
$1,000,000 to $5,000,000 est. value
CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Low Zone Water Line Replacement Project
Bidding
Salida, CO

Last Updated 04/13/2020 10:39 AM
Project Title

2020 Waterline Replacement

Physical Address View project details and contacts
City, State (County) Centennial, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally consists of furnishing, delivering, constructing, installing, connecting, and testing approximately 18,500 lineal feet of open cut 4 to 12-inch waterlines, fire hydrants, blowoff assemblies, residential service line re-activations, and existing waterline abandonment. Existing pipe material includes asbestos cement, PVC, and ductile iron. The Work also includes installation of one sanitary sewer manhole to replace an existing lamphole. The Work includes extensive scheduling, permitting, and traffic control. The construction of all water main line work shall include providing and installing all necessary piping, fittings, valves, hydrants, and all other appurtenances to complete a fully functioning potable water distribution system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents