Similar Projects
Commons Drive - Route 34 to 75th Street - GB021 - City of Aurora
Infrastructure
Conception
$44,500,000 CJ est. value
Aurora, IL 60506

Commons Drive - Route 34 to 75th Street - GB021 - City of Aurora
Infrastructure
Conception
$44,500,000 CJ est. value
Aurora, IL 60506

100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Raymond Street Culvert Rehabilitation
Infrastructure
Design
$244,000 CJ est. value
South Elgin, IL 60177

2022 Combined Sewer Overflow Structure Rehabilitation
Infrastructure
Post-Bid
$440,000 CJ est. value
South Elgin, IL 60177

Engineering Services for 2022 City Wide Resurfacing Phase III Construction
Infrastructure
Post-Bid
Aurora, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

Elgin Distribution Center
New Construction, Infrastructure - 477,115 SF
Construction
$50,000,000 CJ est. value
Elgin, IL 60120

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Partial Site Demolition 720 North Broadway - C123 - City of Aurora
Demolition, Infrastructure
Conception
$700,000 CJ est. value
Aurora, IL 60505

Lexington Club
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
St Charles, IL 60174

Bituminous Patching Mixture
Infrastructure
Post-Bid
Elgin, IL

Civic Center Parking and Streetscape Improvements
Infrastructure
Results
South Elgin, IL

Last Updated 07/24/2023 01:13 PM
Project Title

Airfield Pavement Rehabilitation - Phase 4

Physical Address View project details and contacts
City, State (County) Sugar Grove, IL 60554   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $661,168 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Airfield Pavement Rehabilitation - Phase 4 Region 1 District 1 Federal Project # 317SBGPTBD County(s) Kane IL Project # ARR 4785 Airport Aurora Municipal Sponsor City of Aurora City Sugar Grove Completion Date: 54 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 03A - Airfield Pavement Rehabilitation - Phase 4

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents