Similar Projects
Oregon Coast Aquarium Renovation Phase 2
New Construction, Renovation, Infrastructure - 10,650 SF
Design
$18,000,000 CJ est. value
Newport, OR 97365

New Rehabilitation Facility / The Oregon Coast Aquarium
New Construction, Infrastructure
Design
$9,750,000 CJ est. value
Newport, OR 97365

2023 East 2nd Street Improvements
Infrastructure
Bidding
$450,000 CJ est. value
Yachats, OR 97498

Mbm Bridge Lifeline Yaquina and St Johns Bridge Project
Infrastructure
Bidding
$400,000 CJ est. value
Newport, OR 97365

Schoolhouse Street Improvements
Infrastructure
Post-Bid
Depoe Bay, OR 97341

L9 Pole Replacement Project
Infrastructure
Post-Bid
$622,000 CJ est. value
Newport, OR 97365

Northeast 14th Street Sidewalk - Phase 2
Infrastructure
Results
$522,632 CJ est. value
Lincoln City, OR 97367

Lincoln City Police Utility Building
New Construction, Infrastructure - 600 SF
Results
$416,600 CJ est. value
Lincoln City, OR 97367

US 101 Frontage Road: Ben Jones (Rocky Creek) Bridge
Infrastructure
Design
$6,172,000 CJ est. value
Newport, OR 97365

Crestline Drive Improvements
Infrastructure
Bidding
$2,194,700 CJ est. value
Waldport, OR 97394

Yhona Overlook and Cobble Beach Stairs
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Newport, OR 97365

South Beaver Creek Road: South Fork Beaver Creek Bridge
Infrastructure
Design
$1,636,375 CJ est. value
Seal Rock, OR 97376

RFP Engineering - Construction and Engineering Services for Underground Construction - PacWave South
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Newport, OR 97365

RFP D/B - Hatfield Marine Science Center Student Housing
New Construction, Infrastructure
Post-Bid
$13,000,000 CJ est. value
Newport, OR 97365

Water System Improvements
Renovation, Infrastructure
Post-Bid
$270,000 CJ est. value
Tidewater, OR 97390

Last Updated 03/08/2023 12:04 AM
Project Title

US 101: Culverts (MP 73.46 - 136.29)

Physical Address View project details and contacts
City, State (County) Yachats, OR 97498   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $4,365,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate and replace culverts to ensure they are functioning properly. As of March 08, 2023, the project is in Design status. Anticipated letting date is October 19, 2023. ODOT - US 101: Culverts (MP 73.46 - 136.29) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents