Similar Projects
19th Street Housing Development
New Construction
Design
Palm Harbor, FL

Rehabilitation of Residential Single-Family Properties
Bidding
Saint Petersburg, FL 33731

Emergency Repairs, Residential Homes
Post-Bid
Saint Petersburg, FL 33709

Housing Rehabilitation 1901 Patlin Circle South
Post-Bid
Largo, FL 33770

Emergency Repairs, Residential Homes
Results
Saint Petersburg, FL 33705

Emergency Repairs - Residential Homes
Results
Saint Petersburg, FL 33701

Keene Road Housing Development
New Construction
Pending Verification
Dunedin, FL 34698

Mercyno Development
New Construction
Pending Verification
Palm Harbor, FL

Facade Improvement Grant Program (FIGP), Residential Homes
Post-Bid
Saint Petersburg, FL 33711

Emergency Repairs, Residential Homes
Results
Saint Petersburg, FL 33709

Winchester Development
New Construction
Pending Verification
Largo, FL

Emergency Repairs, Residential Homes
Post-Bid
Saint Petersburg, FL 33705

Emergency Repairs, Residential Homes
Results
Saint Petersburg, FL 33711

Hampton at Clearwater Dining Room Rehabilitation
Renovation
Post-Bid
Clearwater, FL 33759

Emergency Repairs, Residential Homes
Results
Saint Petersburg, FL 33713

Last Updated 12/06/2019 12:47 PM
Project Title

Emergency Repairs, Residential Homes

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33712   (Pinellas County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roof - Replace existing roof with new Hurricane Hardened Roof. Replace rotted beams at porch roof in rear. Include Insurance paperwork and photos to City and Homeowner. Soffit & Fascia - Remove all bad soffit & fascia. Install new vinyl/ aluminum soffit & Fascia entire home. Carport - Remove existing carport Ceiling & Wall - Repair ceiling and wall in dining room and room on other side of sliding glass door. Prep & paint Water Heater - Replace with new. (Old one already removed) Doors - Replace front and rear door including framing with new impact door Hauling and Permits - As needed and required.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents