Similar Projects
Tennis Center - Construction - Town of Flower Mound
Infrastructure
Conception
$12,250,000 CJ est. value
Flower Mound, TX 75022

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cambria Hotel Northlake Texas
New Construction, Infrastructure - 84,966 SF
Post-Bid
$31,100,000 CJ est. value
Northlake, TX 76262

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Southeast Denton Neighborhood Area B (SED-B)
Infrastructure
Results
$13,500,000 est. value
Denton, TX

St. Philip The Apostle Catholic Church
New Construction - 15,979 SF
Construction
$5,000,000 est. value
Flower Mound, TX 75022

The Well Church
New Construction
Construction
Argyle, TX 76266

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Mingo Apartments
New Construction, Infrastructure - 32,096 SF
Design
$6,400,000 CJ est. value
Denton, TX 76209

Windhaven Parkway
Infrastructure
Post-Bid
$10,600,000 est. value
Lewisville, TX

Hillside Water Line Connection
Infrastructure
Results
$225,000 est. value
Flower Mound, TX 75022

Murphy Express #8925 / Crossroads
New Construction, Infrastructure - 5,233 SF
Construction
$1,500,000 CJ est. value
Crossroads, TX 76227

Last Updated 06/29/2023 09:13 AM
Project Title

The Dove Church / Worship Center

Physical Address View project details and contacts
City, State (County) Southlake, TX 76092   (Tarrant County)
Category(s) Heavy and Highway, Religious/Funeral, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Religious Facility, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 29 2023, this project is under construction. Building permits were issued on May 30, 2023. A general contractor has been selected.

Details

13,873 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents