Similar Projects
Last Updated | 05/23/2023 03:05 AM |
Project Title | Construction Drawings for Soda Springs Park and Playground |
Physical Address | View project details and contacts |
City, State (County) | Manitou Springs, CO 80829 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000317302 The City requires this project to be completed within 45 working days. No work shall be done between the hours of 5:30 P.M. and 7:00 A.M. Project is to provide construction drawings for the removal of existing playground equipment, prepare site furnishings to include new playground equipment, trail and landscape improvements at Soda Springs Park. The City reserves the right to contact the references provided in your proposal, as well as other references, without prior notification to you. The City of Manitou Springs (the "City") is seeking Bids to create construction drawings for Soda Springs park. Soda Springs park has been designed at a Master Plan level and we are looking for construction documents for the area identified for playground improvements. Plans include grading, trail improvements, demolition and installation of playground equipment. The Master Plan improvements specific to the playground area is included in the attached bid package. Temporary Fencing (construction) Tree Protection Fencing Demo & Remove Concrete Paving SF 1,145 Demo & Remove Concrete Wall LF 7 Remove & Relocate boulders on-site LS 1 Demo Play Equipment and associated footings Salvage & Relocate Site Furnishings (concrete bench) Remove & Reset Table Demo & Remove Table Clearing & Grubbing Strip & Stockpile Topsoil Erosion Control Construction Surveying Picnic Table Install (set existing provided by Owner) Bicycle Rack - 2 single hoop Scooter Rack Backed Bench 2 Earthwork (cut, fill, compact on site material) CY 350 Concrete Playground Ramp w/cheekwalls Concrete Paving - 6" Depth (Integral Color) SF 1,535 Concrete mowband (6" wide)-integral color LF 390 $ Crusher Fines Paving (5" stabilized) SF 1,085 Replenish EWF SF 1,000 Irrigation - Shrubs, Perennials and Grasses SF 1,750 Irrigation - Sod (repair/replace) SF 120 Top soil - 8" depth (planting areas) CY 45 Shrubs, perennials, grasses SF 1,750 Wood Mulch - planting beds SF 1,750 Lighting and Electrical (new LED fixtures, outlets, power) Installation of new playground equipment per attached plans. Project will be completed under single phase and a single set of construction documents. Question Deadline 04/28/2023 at 12:00 PM MT Questions are submitted online No - Performance Bond 100 % Contact Information Alicia Stoke astoke@manitouspringsco.gov John Stark jstark@manitouspringsco.gov Award Requirements - All or None Award |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |