Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Del Paso Boulevard Road Diet
Infrastructure
Bidding
$3,000,000 est. value
Sacramento, CA 95815

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

MUNI - Design Review - Northpointe Reserve - Dahlin Group
New Construction, Infrastructure
Design
Sacramento, CA 95835

West El Camino Rehabilitation Project
Infrastructure
Bidding
$1,793,000 est. value
Sacramento, CA 95833

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Police Facilities Streetscapes Maintenance
Infrastructure
Results
Sacramento, CA

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Design Build - Construct Parking South East Campus
Alteration
Post-Bid
$2,000,000 to $5,000,000 est. value
Mather, Rancho Cordova, CA 95655

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Last Updated 06/27/2022 03:33 AM
Project Title

34th Street Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95817   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following items of work are to be performed in these Special Provisions: The pavement rehabilitation and pedestrian improvements of 34th Street from 5th Avenue to Truckee Way. Sidewalk and Curb Ramp Construction Pavement Rehabilitation Install pavement markings and roadside signs

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents